PPermitDrop

Permits

2,636 permits • page 1 of 27

Export CSV
ScoreTradeDateCityAddressDescriptionValueContractorStatus
80solar2026-09-17AUSTIN2904 CAVERN MIST LNBailey - 40-15314 - Install new/additional 5.76 kW rooftop solar system to existing residential only using backfed breaker. Utility company - Pedernales Electric Cooperative.Mark Bedellactive
80solar2026-09-14AUSTIN1707 W 42ND STInstallation of a 22.77 kw rooftop solar system on a residential new construction.Eric Kayactive
80solar2026-09-10AUSTIN3514 MALONE DRInstall new 5.81kw rooftop solar system for existing residential only.Chadwyck Preeceactive
80solar2026-09-10AUSTIN15024 SASSAFRAS TRLETJ - Armstrong - 40-12388 - Install new 5.7 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
80solar2026-09-09AUSTIN12603 EUROPA LNInstall new 14.96 kW DC rooftop solar system and 15.0 kWh energy storage system to existing residentialMark Prideactive
80solar2026-09-03AUSTIN1200 BRUS BNDBackup battery system that backs up home along with new main service disconnect. No updates to utility meter only will be requesting a disconnect and reconnect.]Martin Rodriguezfinaled
80solar2026-08-28AUSTIN12920 WIDGE DRScaife - 40-09000 - Install new 3.8kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
80solar2026-08-28AUSTIN1907 CAMINO VIEJOInstall new energy storage system to existing single family residence. Overhead AEWesley Davisactive
80solar2026-08-27AUSTIN9421 SHADY OAKS DRPH2 Install new 2.289kw rooftop solar system for existing residential only.Chadwyck Preeceactive
80solar2026-08-26AUSTIN5000 CREEK BEND DRResidential Add on of Battery to the Residents Existing Roof Mounted Solar SystemBryan Lawactive
80solar2026-08-25AUSTIN10254 MISSEL THRUSH DRInstall new 4.3kW rooftop solar system for existing residential only.Chadwyck Preeceactive
80solar2026-08-25AUSTIN1313 SUMMONERS TALE CTCollins/Matthew - 40-06335 - Install new 3.8 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
80solar2026-08-25AUSTIN7806 PACES MILL LNInstall new 17.2kW rooftop solar system for existing residential only.Chadwyck Preeceactive
80solar2026-08-25AUSTIN3801 KNOLLWOOD DR BLDG AStanton - 39-96789 - Install new 5.7 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
80solar2026-08-20AUSTIN5406 PENDLETON LNInstall new 9.775kW rooftop solar system for existing residential only.Chadwyck Preeceactive
80solar2026-06-26AUSTIN4904 SEADRIFT DRResidential Installation of Solar PV System with Battery BackupMichael Novakactive
80solar2026-05-26AUSTIN6200 LOST HORIZON DRHuckabee - 39-53028 - Install new 200kW rooftop solar system to existing residential only using backfed breaker only. *200 Amp 6.57 kW DC / 5.76 kW AMark Bedellactive
75solar2026-09-14AUSTIN13503 BROADMEADE AVE(ETJ) Install new _14.4__kW rooftop solar system to existing residential only using line side tap ONLY.Mark Bedellactive
75solar2026-09-05AUSTIN13208 LAMPLIGHT VILLAGE AVEJohnson/Schultz - 40-10945 - Install new 5.7 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
75solar2026-08-20AUSTIN3006 VAL DRWilson - 40-06206 - Install new 3.8 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
70solar2026-08-28AUSTIN15621 BELFIN DRInstallation of new 8.600 kW DC / 7.600 kW AC roof-mounted photovoltaic solar system on existing single-family residence at 15621 Belfin Dr Austin TX 78717. System consists of (20) Mate Solar MS430-54H 430W modules with (20) Enphase IQ8HC-72-M-DOM-US microinverters arranged in two branch circuits of 10 modules each Enphase IQ Combiner 40A/2P PV backfeed breaker and 60A visible lockable non-fused AC disconnect. Existing 200A 120/240V single-phase service to remain. No main service panel upgrade and no battery/energy storage system. Utility provider is Pedernales Electric Cooperative (PEC). Interconnection is on the customer side of the meter through the existing main service panel.Eleazar R Trevinofinaled
70solar2026-08-25AUSTIN7100 TOWERING OAKS DRChavis-Parod - 39-63869 - Install new 5.76 kW rooftop solar system to existing residential only using backfed breaker only.Mark Bedellactive
70solar2026-08-25AUSTIN3616 PENNSYLVANIA AVE BLDG 3Solar Prewire only for BLDG 3 of 3 or a Residential new Construction.Eric Kayactive
70solar2025-07-23AUSTIN1406 DWYCE DRJudge - Install new 7.30kW rooftop solar system to existing residential only using line side tap.finaled
70solar2025-07-23AUSTIN8302 KROMER STBrown - Install new 7.6kW rooftop solar system to existing residential only using backfed breakerfinaled
65solar2026-09-17AUSTIN2412 HAVENSIDE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN4215 TALLOWOOD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN7407 NEWHALL LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN1716 RICHCREEK RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN3127 HONEY TREE LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN11909 PORTOBELLA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN4209 SINCLAIR AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN12012 NATURES BNDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN9432 HOPELAND DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN5807 LONG CTBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN2205 BONITA STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN10513 LA COSTA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN5604 MOUNT BONNELL RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN6400 FAIR VALLEY TRLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN902 TERRELL HILL DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN5009 TRADING BNDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN8862 CHALK KNOLL DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN5513 TRAVIS GREEN LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-17AUSTIN4403 GREYSTONE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-16AUSTIN2708 SCENIC DRExpress: rooftop solar electric panels tilted up$1Jeff Bendallactive
65solar2026-09-16AUSTIN1010 E APPLEGATE DRAdding energy storage system to existing PV systemMark Prideactive
65solar2026-09-15AUSTIN7813 ASPEN HIGHLANDS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-15AUSTIN3709 N GREEN TRAILSBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-15AUSTIN4008 RIDGELEA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-14AUSTIN1703 CLIFFSIDE DRBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion.Martin Rodriguezfinaled
65solar2026-09-11AUSTIN5007 DUVAL STPre-wire for solarMark Prideactive
65solar2026-09-10AUSTIN4003 GREENHILL PLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-10AUSTIN4501 GRIDER PASSBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-10AUSTIN8404 CARRANZO DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-10AUSTIN4203 AVENUE BBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-10AUSTIN10306 SPICEWOOD MESABASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-10AUSTIN6814 PIONEER PLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-10AUSTIN7601 PARKVIEW CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-10AUSTIN10012 CIRCLEVIEW DRSolar system additionAlejandro Mompazactive
65solar2026-09-10AUSTIN3209 GILBERT STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-09AUSTIN7300 ANAQUA DR**Adding (10) Mission Solar Energy LLC MSX10-435HN0B solar panels. In total will be installing a 4.35 kW PV system and (1) TESLA INC. 1807000-XX-Y. The customer has an existing system that consists of (18) MISSION SOLAR ENERGY LLC MSX10-435HN0B panels and (1) TESLA INC. 1707000-XX-Y inverter/battery.Michael Solanofinaled
65solar2026-09-09AUSTIN2400 TRAIL OF MADRONESWe want to install a Battery at this residence. We will be installing downstream of main service disconnect.Martin Rodriguezfinaled
65solar2026-09-07AUSTIN2518 WOOLDRIDGE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN4109 AVENUE ABASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN7917 WEST RIM DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN7817 OTEKA CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN1209 CHOQUETTE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN7500 PARKVIEW CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN2009 REAL CATORCEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN1314 PIEDMONT AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN6916 JESTER WILD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN3205 MC ELROY DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN13129 BAYFIELD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN4405 SECLUDED HOLWBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN2908 ROUND TABLE RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN1825 TRAVIS HEIGHTS BLVDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN7413 CORDOBA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-07AUSTIN501 N COMMONS FORD RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN6613 ARGENTIA RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN5008 WEST FRANCES PLBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN3409 BONNIE RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN1105 WILLOW STBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN7205 VALBURN DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN11292 TAYLOR DRAPER LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN9804 BIG VIEW DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN2418 BAHAMA RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN8809 BELKNAP RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN1702 NORRIS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN4407 ELOHI DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN4500 GRAND CYPRESS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN1908 KAREN AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN4500 DUSIK LNBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN4100 BELMONT PARK DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-04AUSTIN11728 LAGO DE GARDA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
65solar2026-09-03AUSTIN10610 SIERRA OAKSBackup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion.Martin Rodriguezfinaled
65solar2026-09-02AUSTIN9409 OXBOW STRAP DRSOLAR INSTALLTION WITH A SYSTEM SIZE OF 10.12KW (22) REC460 on IQ8X domesticLogan Stoneactive
65solar2026-09-01AUSTIN7016 VIA DONO DRInstall additional pv components. We are not upgrading the size of the service not upgrading the meter size.Chadwyck Preeceactive
65solar2026-08-31AUSTIN7116 CROMARTY CVInstall Solar Panels on Bluebonnet SystemMichael Gonzalesactive
65solar2026-08-31AUSTIN9633 NEWFOUNDLAND CIRMove and connect existing solar panelsMichael Gonzalesactive
65solar2026-08-31AUSTIN12620 SKY HARBOR DRInstall 3.080kW of solar panelsMichael Gonzalesactive
100 rows shown