| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 50 | roofing | 2026-07-30 | AUSTIN | 12533 LABRADOR CV | Detach and reset for an already installed solar system due to hail damage and roof replacement. The current system will be detached and new higher wattage solar panels will be used with the original inverters. | David Davis | active | |
| 50 | roofing | 2026-07-29 | AUSTIN | 4000 AVENUE D | Storm Damage Repair - Service Rebuild | Jacob Rivera | finaled | |
| 50 | roofing | 2026-07-23 | AUSTIN | 3711 S MOPAC EXPY SVRD NB BLDG 2 | Replacement of exiting TPO roof for Building 1 & 2 Two Applications | Joseph Robertson | finaled | |
| 50 | roofing | 2026-07-23 | AUSTIN | 3711 S MOPAC EXPY SVRD NB BLDG 1 | Replacement of exiting TPO roof for Building 1 & 2 Two Applications | Joseph Robertson | finaled | |
| 50 | roofing | 2026-07-22 | AUSTIN | 301 W 29TH ST | 7 DAY - fire damage. Replace roof replace siding replace 2 balconies replace trusses drywall lights in corridor painting exterior. - OVA | Sarah Ewing | active | |
| 50 | roofing | 2026-07-22 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing and mechanical. | Christopher Woods | active | |
| 50 | roofing | 2026-07-17 | AUSTIN | 3300 NORTHEAST DR | Express: Re-roofing (located in WUI) - Replace hail-damaged composition roof with dimensional shingles and associated underlayment flashing drip edge pipe leads and like-kind vents. Work to comply with WUI requirements. No structural changes. | $1 | Douglas Redman | active |
| 50 | roofing | 2026-07-16 | AUSTIN | 3101 GOVALLE AVE | GAF TPO roof replacement system fully tapered insulation system. | Christopher Box | active | |
| 50 | roofing | 2026-07-16 | AUSTIN | 8000 RESEARCH BLVD SVRD SB | Replacement of (1) roof top unit - Like for like replacement | George Blaikie | active | |
| 50 | roofing | 2026-07-16 | AUSTIN | 1907 KENWOOD AVE UNIT B | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit B: 3 bedroom 2 bath with rear covered patio. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Cecilia Lopez | active | |
| 50 | roofing | 2026-07-15 | AUSTIN | 1702 ELMIRA RD BLDG 3 | Bldg 3: New construction 3-unit use single-family residential 2-story 4 bedroom 3 bath with attached 1-car garage covered front porch covered rear patio covered roof deck and uncovered roof deck. | $0 | Gerald Carter | active |
| 50 | roofing | 2026-07-15 | AUSTIN | 1702 ELMIRA RD BLDG 2 | Bldg2: New construction 3-unit use single-family residential 2-story 3 bedroom 3 bath with attached 1-car garage covered front porch covered rear patio and covered roof deck. | $0 | Gerald Carter | active |
| 50 | roofing | 2026-07-09 | AUSTIN | 10625 W PARMER LN | RE ROOF - remove old tpo membrane and replace with new tpo roofing - OVA | finaled | ||
| 50 | roofing | 2026-07-09 | AUSTIN | 601 BISSONET LN | Express: roof repair roof decking replacement | $1 | Jim Hardwick | finaled |
| 50 | roofing | 2026-07-08 | AUSTIN | 704 W 21ST ST | Replace existing roof structure due to fire damage plus minor exterior repairs as drawn and noted. | Jorge Bejarano | active | |
| 50 | roofing | 2026-07-06 | AUSTIN | 1006 E CESAR CHAVEZ ST | Express: Repairs due to fire damage (damaged to portion of rear floor joists and roof and smoke needs to be gutted to the studs and replaced inside fully not seeking trades until the remodel side) | $1 | Josh Hook | active |
| 50 | roofing | 2026-07-01 | AUSTIN | 2010 ALAMEDA DR | AISD Travis Heights Elementary School in Austin: project involves roof replacement at the Pre K classrooms cafeteria and gym electrical panel cover replacement at the gym stage installation of emergency lighting in classrooms and corridors replacement of Pre-K restroom doors; and construction of a new mental health center space. | Richard Barroso | finaled | |
| 50 | roofing | 2026-06-30 | AUSTIN | 1023 E RIVERSIDE DR | Demo of existing roof and walls - Install new beam above garage doorway. Proposed building of a 2 Tier Deck above garage. Minor plumbing and electrical to add exterior sink and refrigerator electrical hook-up. Please note: Proposed deck is to be built over existing house footprint. No change to impervious. | Eleazar R Trevino | finaled | |
| 50 | roofing | 2026-06-30 | AUSTIN | 702 HUNTINGDON PL | WUI Compliance roof replacement. Removing shingles and installing a new class A fire-rated McElroy Medallion II 24-gauge standing seam metal roof system. Installing VanBoxel Prime SA High Temp self-adhered underlayment over the existing solid decking. No decking replacement is being performed. | $1 | Drew Proctor | finaled |
| 50 | roofing | 2026-06-30 | AUSTIN | 1402 PARKER LN BLDG 3 | Condominium Complex Single Replacement Like for Like. Simple reroof | Matthew Smith | finaled | |
| 50 | roofing | 2026-06-29 | AUSTIN | 1023 E RIVERSIDE DR | Demo of existing roof and walls - Install new beam above garage doorway. Proposed building of a 2 Tier Deck above garage. Minor plumbing and electrical to add exterior sink and refrigerator electrical hook-up. Please note: Proposed deck is to be built over existing house footprint. No change to impervious. add a gas line for this project | Eric Garcia | active | |
| 50 | roofing | 2026-06-26 | AUSTIN | 10517 BRODIE SPRINGS TRL | EXPRESS: Roof replacement Class A fire roofing material | $1 | Fareed Tulbah | finaled |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8523 | replacement of roof building 8523 - OVA | Amber Whitaker | active | |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8543 | Replacement of roof | Amber Whitaker | active | |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8541 | Replacement of roof. Existing multifamily building. | Amber Whitaker | active | |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8549 | Replacement of roof | Amber Whitaker | active | |
| 50 | roofing | 2026-06-25 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8545 | REPLACEMENT OF ROOF | Amber Whitaker | active | |
| 50 | roofing | 2026-06-25 | AUSTIN | 73 MILDRED ST | Express- Roof replacement with decking board replacement greater than 128 sq ft | $1 | Luke Miller | active |
| 50 | roofing | 2026-06-24 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing and mechanical. | Urban Wolff | active | |
| 50 | roofing | 2026-06-23 | AUSTIN | 1907 KENWOOD AVE UNIT B | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit B: 3 bedroom 2 bath with rear covered patio. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | HERIDO MORALES | active | |
| 50 | roofing | 2026-06-22 | AUSTIN | 9604 BELL MOUNTAIN DR | Express: Exterior siding/brick repair/replacement excess 128sq.ft. total roof replacement w/ WUI complaint metal roof window and door replacement size for size same locations | $1 | David Davison | active |
| 50 | roofing | 2026-06-19 | AUSTIN | 1625 BRUSHY VIEW CV | EMERGENCY REPAIR TO RISER ONLY FROM STORM DAMAGE. AE PULLED METER REPAIR WAS COMPLETED AND INSPECTED BY COA INSPECTOR SEAN MCMULLIN AND AE RECONNECTED SERVICE | Stephen J Provencio | finaled | |
| 50 | roofing | 2026-06-14 | AUSTIN | 8506 STILLWOOD LN | Express: Roof replacement with new decking | $1 | Cole Shiflet | finaled |
| 50 | roofing | 2026-06-12 | AUSTIN | 10402 D K RANCH RD | Fire Damage Repair drywall framing and roofing no changes in floor plan Revision 1: Add EP MP PP | Luis Olivares | active | |
| 50 | roofing | 2026-06-11 | AUSTIN | 10402 D K RANCH RD | Fire Damage Repair drywall framing and roofing no changes in floor plan Revision 1: Add EPMPPP | Mark Williams | active | |
| 50 | roofing | 2026-06-11 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing and mechanical. | Urban Wolff | active | |
| 50 | roofing | 2026-06-11 | AUSTIN | 6001 HIGHLANDALE DR | Replacing damaged riser/weatherhead (storm damage) and upgrading to 200amps | Cory Shope | finaled | |
| 50 | roofing | 2026-06-11 | AUSTIN | 1011 W 40TH ST | Replacement of any self-contained packaged units Removal and replacement like for like of 3 roof top package units. **Soithstate Bank | Christopher Gelina | active | |
| 50 | roofing | 2026-06-09 | AUSTIN | 421 E 6TH ST | Re-roof with new roof insulation and TPO and replacement of select of top mechanical equipment. Existing piano bar. | Keating Kuhn | finaled | |
| 50 | roofing | 2026-06-09 | AUSTIN | 10402 D K RANCH RD | Fire Damage Repair drywall framing and roofing no changes in floor plan Revision1: Add EP MP PP | Oraquio Moreno | active | |
| 50 | roofing | 2026-06-05 | AUSTIN | 200 ARNULFO ALONSO WAY | ePlan: Commercial Expedited Review - Remodel to Existing PARD Recreation - including roof replacement abatement restoration of windows door chimneys electrical/plumbing upgrades new HVAC system and reconfiguration of restroom and support spaces (3169 SF) | Dale Sellers | active | |
| 50 | roofing | 2026-06-04 | AUSTIN | 1300 LAVACA ST | Replacement of any self-contained packaged units Replacement of 10-ton package unit located on roof | Lavelle Darnell Jr | finaled | |
| 50 | roofing | 2026-06-03 | AUSTIN | 421 E 6TH ST | Re-roof with new roof insulation and TPO and replacement of select of top mechanical equipment. Existing piano bar. | Jennifer Torres | active | |
| 50 | roofing | 2026-05-28 | AUSTIN | 2010 ALAMEDA DR | AISD Travis Heights Elementary School in Austin: project involves roof replacement at the Pre K classrooms cafeteria and gym electrical panel cover replacement at the gym stage installation of emergency lighting in classrooms and corridors replacement of Pre-K restroom doors; and construction of a new mental health center space. | Rafael Thrash | active | |
| 50 | roofing | 2026-05-27 | AUSTIN | 4604 S LAMAR BLVD SB | REROOF - roof replacement of front office building - OVA | John Mora | finaled | |
| 50 | roofing | 2026-05-22 | AUSTIN | 608 BLANCO ST | RE ROOF - Shingle re-roof replacement of existing singles - OVA | Jack Dailey | finaled | |
| 50 | roofing | 2026-05-19 | AUSTIN | 709 CONGRESS AVE | 7 DAY repair and replace and deteriorated wood repaint. replace existing roof with new TPO roof. - OVA | active | ||
| 50 | roofing | 2026-05-18 | AUSTIN | 3418 BLUMIE ST | Emergency repair of riser from storm damage | Cory Shope | finaled | |
| 50 | roofing | 2026-05-15 | AUSTIN | 1712 E 11TH ST | The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A 1B 1C 1D and 2A and installation of RH-1 RH-2 and RH-5 AISD Blackshear Elementary School in Austin | Michael Irwin | finaled | |
| 50 | roofing | 2026-05-13 | AUSTIN | 1712 E 11TH ST | The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A 1B 1C 1D and 2A and installation of RH-1 RH-2 and RH-5 AISD Blackshear Elementary School in Austin | John Robinson | finaled | |
| 50 | roofing | 2026-05-13 | AUSTIN | 1712 E 11TH ST | The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A 1B 1C 1D and 2A and installation of RH-1 RH-2 and RH-5 AISD Blackshear Elementary School in Austin | Ian Rolls | finaled | |
| 50 | roofing | 2026-05-12 | AUSTIN | 3700 CONVICT HILL RD | Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement | Sergio Perez | finaled | |
| 50 | roofing | 2026-05-11 | AUSTIN | 3700 CONVICT HILL RD | Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement | James Paul | finaled | |
| 50 | roofing | 2026-05-04 | AUSTIN | 910 W 25TH ST | Fire Damage Remediation and Rebuild on 3 Floors Multiple units 210 505 506 605 606. Project will require Mechanical and Electrical Roof repaid with structural letter stucco repair and sheetrock repair. Mold remediation letter will be required. | $4 | Jonathan Standley | active |
| 50 | roofing | 2026-05-04 | AUSTIN | 910 W 25TH ST | Fire Damage Remediation and Rebuild on 3 Floors Multiple units 210 505 506 605 606. Project will require Mechanical and Electrical Roof repaid with structural letter stucco repair and sheetrock repair. Mold remediation letter will be required. | Raul Alonso | active | |
| 50 | roofing | 2026-05-04 | AUSTIN | 8617 PEAFOWL ST | *Green Building* New 2-story 5 bedroom 4 bathroom single family residence with attached garage covered front porch and rear covered patio. Revision 1: Changed roof pitch to 5:12. Changed all side and rear to stucco. Changed stone rowlock to stucco cap. Lowered porch towner and expanded front porch footprint. | $0 | Marla Lamb | active |
| 50 | roofing | 2026-05-01 | AUSTIN | 2304 HANCOCK DR | QT - TPO ROOF REPLACEMENT DOWN TO PLYWOOD - OVA | Cameron Smith | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8515 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8503 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8507 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8539 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8529 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8555 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8551 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8547 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8533 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8519 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8505 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8531 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8513 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8511 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8521 | Replacement of roof. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8501 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-30 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8509 | Replacement of roof. Existing multifamily. | Amber Whitaker | active | |
| 50 | roofing | 2026-04-17 | AUSTIN | 1023 E RIVERSIDE DR | Demo of existing roof and walls - Install new beam above garage doorway. Proposed building of a 2 Tier Deck above garage. Minor plumbing and electrical to add exterior sink and refrigerator electrical hook-up. Please note: Proposed deck is to be built over existing house footprint. No change to impervious. | $1 | Lior Shaked | active |
| 50 | roofing | 2026-04-15 | AUSTIN | 1813 E 38TH HALF ST BLDG 1 UNIT 1A | Bldg 1: New construction 3-unit use duplex residential: Unit A 3-story 4 bedroom 3.5 bath with attached 1-car carport covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck. | Felix Solorio | finaled | |
| 50 | roofing | 2026-04-15 | AUSTIN | 1813 E 38TH HALF ST BLDG 2 | Bldg 2: New construction 3-unit use single-family residential 3-story 3 bedroom 2.5 bath with attached 1-car carport covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck. | Felix Solorio | finaled | |
| 50 | roofing | 2026-04-15 | AUSTIN | 1813 E 38TH HALF ST BLDG 1 UNIT 1B | Bldg. 1 Unit B: New construction 3-unit use duplex residential 3-story 4 bedroom 3.5 bath with covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck. | Felix Solorio | finaled | |
| 50 | roofing | 2026-04-13 | AUSTIN | 13091 POND SPRINGS RD | Roof Replacement for Retail Building #02 | Bryan Meklir | finaled | |
| 50 | roofing | 2026-04-13 | AUSTIN | 13091 POND SPRINGS RD | Roof Replacement for Shopping Center | Bryan Meklir | finaled | |
| 50 | roofing | 2026-04-11 | AUSTIN | 1137 WEBBERVILLE RD BLDG 1 | New 3-story 3 bedroom 3 bathroom dwelling unit with attached carport covered porches 2nd floor screened porch 2nd floor partially covered balcony 3rd floor partially covered balcony and roof deck. | $0 | Gerald Carter | active |
| 50 | roofing | 2026-04-11 | AUSTIN | 1137 WEBBERVILLE RD BLDG 2 | New 3-story 2 bedroom 2.5 bathroom dwelling unit with attached carport covered porch 2nd floor screened porch 2nd floor covered balcony 3rd floor partially covered balcony and roof deck. | $0 | Gerald Carter | active |
| 50 | roofing | 2026-04-10 | AUSTIN | 8527 N CAPITAL OF TEXAS HWY NB | Simple re roof - replacement of Roof on Leasing Building - OVA | Amber Whitaker | active | |
| 50 | roofing | 2026-03-31 | AUSTIN | 9209 ROCK CASTLE CV | EXPRESS: Roof replacement | $1 | Jacob Lange | active |
| 50 | roofing | 2026-03-29 | AUSTIN | 1907 KENWOOD AVE UNIT B | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit B: 3 bedroom 2 bath with rear covered patio. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Joe Chavez | active | |
| 50 | roofing | 2026-03-29 | AUSTIN | 1907 KENWOOD AVE UNIT A | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit A: 3 bedroom 2 bath with front covered porch rear covered balcony and addition of foyer & HVAC closet. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Joe Chavez | active | |
| 50 | roofing | 2026-03-25 | AUSTIN | 2815 RIO GRANDE ST | Shingle roof replacement. Condominiums. | Zachary Crowell | active | |
| 50 | roofing | 2026-03-23 | AUSTIN | 7006 JUNEBERRY CV | EXPRESS: Refoof due to hail damage. Replacing underlayment shingles drip edge pipe jack flashing and gutters. | $1 | Michael Kastel | finaled |
| 50 | roofing | 2026-03-19 | AUSTIN | 910 W 22ND HALF ST | Express: replace one window like-for-like replace rotted wood/siding drywall repair roof repair exempt work (garage door replacement door replacement) | Juan Martinez | finaled | |
| 50 | roofing | 2026-03-18 | AUSTIN | 1100 SUMMIT ST | express existing uncovered wood deck due to fire damage Eric Thomas approved for this to be processed as express fire damage Revision: Re-roof stru | Robert Salgado | active | |
| 50 | roofing | 2026-03-18 | AUSTIN | 1100 SUMMIT ST | express existing uncovered wood deck due to fire damage Eric Thomas approved for this to be processed as express fire damage Revision: Re-roof structure with metal roof replace drywall and insulation rewire electrical and repair as needed plumbing repair replace plumbing fixtures like for like Kitchen and cosmetic upgrades | Robert Salgado | active | |
| 50 | roofing | 2026-03-13 | AUSTIN | 8617 COBBLESTONE | EXPRESS: Replace whole shingle roof due to hail damage | $1 | Ben Keiderling | finaled |
| 50 | roofing | 2026-03-05 | AUSTIN | 6602 LAIRD DR | Express: siding repair stone removal roof replacement | $1 | Lane White | active |
| 50 | roofing | 2026-03-05 | AUSTIN | 3110 VAL DR | Express: siding repair brick repair roof replacement | $1 | Lane White | active |
| 50 | roofing | 2026-03-04 | AUSTIN | 12207 MUSTANG CHASE | Addition remodel and new accessory Addition and remodel to existing residence garage conversion roof replacement and addition window replacement new | Adam Holman | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 1821 DIRECTORS BLVD | Replacement of any self-contained packaged units Change out of RTUs and split systems. Work will take place on the roof and ceiling spaces of levels 1 | James Marek | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 9330 UNITED DR BLDG 4 | Replacement of any self-contained packaged units Scope of work: Replacing 2 roof top units like for like with no modifications. RTU#1 7.5 ton & RTU#2 | Jacob Lee Phillips | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 910 W 22ND HALF ST | Express: replace one window like-for-like replace rotted wood/siding drywall repair roof repair exempt work (garage door replacement door replacement) | $1 | Steve Johnson | finaled |
| 50 | roofing | 2026-03-04 | AUSTIN | 1821 DIRECTORS BLVD | Replacement of any self-contained packaged units Change out of RTUs and split systems. Work will take place on the roof and ceiling spaces of levels 1 and 2. New controls wiring will installed and new t-stats | James Marek | finaled | |
| 50 | roofing | 2026-03-04 | AUSTIN | 9330 UNITED DR BLDG 4 | Replacement of any self-contained packaged units Scope of work: Replacing 2 roof top units like for like with no modifications. RTU#1 7.5 ton & RTU#2 5 ton | Jacob Lee Phillips | finaled |