PPermitDrop

Permits

2,534 permits • page 6 of 26

Export CSV
ScoreTradeDateCityAddressDescriptionValueContractorStatus
50roofing2026-03-04AUSTIN9330 UNITED DR BLDG 4Replacement of any self-contained packaged units Scope of work: Replacing 2 roof top units like for like with no modifications. RTU#1 7.5 ton & RTU#2Jacob Lee Phillipsfinaled
50roofing2026-03-04AUSTIN910 W 22ND HALF STExpress: replace one window like-for-like replace rotted wood/siding drywall repair roof repair exempt work (garage door replacement door replacement)$1Steve Johnsonfinaled
50roofing2026-03-04AUSTIN1821 DIRECTORS BLVDReplacement of any self-contained packaged units Change out of RTUs and split systems. Work will take place on the roof and ceiling spaces of levels 1 and 2. New controls wiring will installed and new t-statsJames Marekfinaled
50roofing2026-03-04AUSTIN9330 UNITED DR BLDG 4Replacement of any self-contained packaged units Scope of work: Replacing 2 roof top units like for like with no modifications. RTU#1 7.5 ton & RTU#2 5 tonJacob Lee Phillipsfinaled
50roofing2026-03-04AUSTIN12207 MUSTANG CHASEAddition remodel and new accessory Addition and remodel to existing residence garage conversion roof replacement and addition window replacement new siding to addition and paint new metal shedAdam Holmanfinaled
50roofing2026-03-03AUSTIN1114 TERRY DRExpress: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers paintingDwight LaBranactive
50roofing2026-03-03AUSTIN3700 CONVICT HILL RDPer AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacementKatherine Webbactive
50roofing2026-03-02AUSTIN800 BANISTER LNShingle Roof Replacement only.Zachary Crowellactive
50roofing2026-02-26AUSTIN2211 W BRAKER LNReplacement of any self-contained packaged units change out one Trane roof top unit model ysk090a4sol000 460 volt unit.Clayton Danielactive
50roofing2026-02-23AUSTIN5510 HITCHER BNDExpress: roof shingle replacement in WUI$1Dennis Kashkinactive
50roofing2026-02-20AUSTIN1907 KENWOOD AVE UNIT AAddition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit A: 3 bedroom 2 bath with front covered porch rear covered balcony and addition of foyer & HVAC closet. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT.$1Shaya Habibiactive
50roofing2026-02-20AUSTIN1907 KENWOOD AVE UNIT BAddition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit B: 3 bedroom 2 bath with rear covered patio. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT.$1Shaya Habibiactive
50roofing2026-02-18AUSTIN6801 JESTER BLVDReplacement of existing deck siding and roof. Partial raising of interior floor. Remodel of deck to match height of interior/avoid entry steps. Slight$1Nick Chappellactive
50roofing2026-02-17AUSTIN2107 FALCON HILL DRIce storm damage. Replace damaged 2 inch conduit riser.Dustin Robertsactive
50roofing2026-02-17AUSTIN13450 N US 183 HWY SVRD SBTPO Roof Overlayfinaled
50roofing2026-02-11AUSTIN730 W STASSNEY LN UNIT 105Structural and interior repairs following a fire in the suite. Repairs include - replacement of damaged trusses metal roof decking and roof replacemenGREGORY PADALECKIactive
50roofing2026-02-11AUSTIN1114 TERRY DRExpress: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers paintingEddie Guerreroactive
50roofing2026-02-11AUSTIN730 W STASSNEY LN UNIT 105Structural and interior repairs following a fire in the suite. Repairs include - replacement of damaged trusses metal roof decking and roof replacement for Suite 105GREGORY PADALECKIactive
50roofing2026-02-06AUSTIN1200 E RUNDBERG LNInterior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2Richard Minyardactive
50roofing2026-02-04AUSTIN1114 TERRY DRExpress: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers paintingEdgar Tafollaactive
50roofing2026-02-04AUSTIN301 SAN JACINTO BLVDRoof overlayfinaled
50roofing2026-01-22AUSTIN5601 MENCHACA RDRe-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be iGregory Lee Gaddyfinaled
50roofing2026-01-22AUSTIN412 E 6TH STEmergency Leak repair / replacement- Tx Gas is relocating the side walk curb meter to the right side of the building due to a leak at their connection and remove any trip hazards that are in place. The building is currently using gas for the RTU heater and water heater. The line run is about 150 to relocate over the roof top of the building.ERNEST DURANfinaled
50roofing2026-01-22AUSTIN5601 MENCHACA RDRe-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be installed at roof requires access to ceiling space ceiling tile replacement as required to access new roof drains.Gregory Lee Gaddyfinaled
50roofing2026-01-20AUSTIN5601 MENCHACA RDRe-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be iKatherine Webbfinaled
50roofing2026-01-20AUSTIN5601 MENCHACA RDRe-Roofing and replacement of roof drains. Installation of new Windows at adjacent wall to allow for added insulation taper. Roof drain piping to be installed at roof requires access to ceiling space ceiling tile replacement as required to access new roof drains.Katherine Webbfinaled
50roofing2026-01-16AUSTIN906 SWEETWATER RIVER DRElectrical support for siding removal and replacement. With approved permit a shutdown date will be obtained from AE on this date after service has been disconnected the service equipment will be loosen off the wall enough for the existing siding to be removed blocking will be installed to support the equipment new siding will be installed by siding contractor ( 21st Century Painting and Roofing) service equipment will be reattached to the wall inspection will be requested test voltage once service has been re-energized by AE. No improvements or changes will be made to the service.Timothy R. Putmanfinaled
50roofing2026-01-16AUSTIN3607 TYRONE DRElectrical support for removal and replacement of siding. Scope will consist of service disconnect from AE loosen service equipment enough from wall for existing siding to be removed siding contractor (21st Century Painting and Roofing) will install blocking to support service equipment install new siding Putman Electrical will reattach service equipment request inspection and test voltage once AE has re-energized the service. There will be no changes or upgrades to the service.Timothy R. Putmanfinaled
50roofing2026-01-13AUSTIN1200 E RUNDBERG LNInterior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2Vincent Gillettefinaled
50roofing2026-01-12AUSTIN3701 WOODBURY DRAISD PROJECT - Addition of high-pile rack storage system to existing warehouse. Demolition of roof-mounted ventilation fans and skylights. Demolition of space-mounted unit heaters. Roofing repairs and new roof overlay. New gas piping to serve new HVAC equipment and heaters. Replacement of existing wet pipe fire sprinkler system with new ESFR sprinkler system in the high-pile storage area. Repair of sliding warehouse doors. Replacement of dock levelers. (Dry food)Abel Martinezfinaled
50roofing2026-01-08AUSTIN3701 WOODBURY DRAISD PROJECT - Addition of high-pile rack storage system to existing warehouse. Demolition of roof-mounted ventilation fans and skylights. Demolition of space-mounted unit heaters. Roofing repairs and new roof overlay. New gas piping to serve new HVAC equipment and heaters. Replacement of existing wet pipe fire sprinkler system with new ESFR sprinkler system in the high-pile storage area. Repair of sliding warehouse doors. Replacement of dock levelers. (Dry food)Ereli Jaramillo Gonzalezactive
50roofing2026-01-06AUSTIN3701 WOODBURY DRAISD PROJECT - Addition of high-pile rack storage system to existing warehouse. Demolition of roof-mounted ventilation fans and skylights. Demolition of space-mounted unit heaters. Roofing repairs and new roof overlay. New gas piping to serve new HVAC equipment and heaters. Replacement of existing wet pipe fire sprinkler system with new ESFR sprinkler system in the high-pile storage area. Repair of sliding warehouse doors. Replacement of dock levelers. (Dry food)Ronald Priceactive
50roofing2026-01-05AUSTIN3701 WOODBURY DRAISD PROJECT - Addition of high-pile rack storage system to existing warehouse. Demolition of roof-mounted ventilation fans and skylights. Demolition of space-mounted unit heaters. Roofing repairs and new roof overlay. New gas piping to serve new HVAC equipment and heaters. Replacement of existing wet pipe fire sprinkler system with new ESFR sprinkler system in the high-pile storage area. Repair of sliding warehouse doors. Replacement of dock levelers. (Dry food)Tyler Walbridgeactive
50roofing2025-12-22AUSTIN12901 BROUGHTON WAY BLDG AInstallation of solar panels on existing residential roof. 6.16 kW. Addition of 1 0-30A circuits. 14 panels. Upgrade Electrical Service from ExistingDavid Conradactive
50roofing2025-12-22AUSTIN12901 BROUGHTON WAY BLDG AInstallation of solar panels on existing residential roof. 6.16 kW. Addition of 1 0-30A circuits. 14 panels. Upgrade Electrical Service from Existing No Main Breaker/125A to New 125/200A 120/240V Single Phase. Temporary Disconnect / Reconnect Required for InstallationDavid Conradactive
50roofing2025-12-19AUSTIN10402 D K RANCH RDFire Damage Repair drywall framing and roofing no changes in floor plan$1Jose Snyderactive
50roofing2025-12-16AUSTIN12624 ALBERTA RIDGE TRLExpress - Change front slope roof material to metal from shingles. Decking replacement during installation more than 128 ft required.$1Stacie Fellerfinaled
50roofing2025-12-16AUSTIN1813 E 38TH HALF ST BLDG 1 UNIT 1BBldg. 1 Unit B: New construction 3-unit use duplex residential 3-story 4 bedroom 3.5 bath with covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck.Mark Hendersonactive
50roofing2025-12-16AUSTIN1813 E 38TH HALF ST BLDG 2Bldg 2: New construction 3-unit use single-family residential 3-story 3 bedroom 2.5 bath with attached 1-car carport covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck.Mark Hendersonactive
50roofing2025-12-16AUSTIN1813 E 38TH HALF ST BLDG 1 UNIT 1ABldg 1: New construction 3-unit use duplex residential: Unit A 3-story 4 bedroom 3.5 bath with attached 1-car carport covered front porch covered rear patio 3rd floor balcony and uncovered roof top deck.Mark Hendersonactive
50roofing2025-12-11AUSTIN1200 E RUNDBERG LNInterior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2Selvan Wigleyactive
50roofing2025-12-05AUSTIN6034 WEST COURTYARD DRTPO roof overlayfinaled
50roofing2025-12-05AUSTIN1405 BERKSHIRE DRExpress- 2600 sq ft [roof] decking removal and replacement$1Nathan Navarroactive
50roofing2025-12-01AUSTIN6101 HIGHLAND CAMPUS DR BLDG 3000Replacement of failing double doors within existing Building 3000; addition of card readers at three sets of doors; replacement of roof ladder with aRyan Ogleactive
50roofing2025-11-25AUSTIN7800 GINKGO CVExpress: Shingle roof replacement (Located in WUI)$1Chris Dammertfinaled
50roofing2025-11-20AUSTIN4817 CASWELL AVEExpress- Fire and smoke damage to property. Minor framing portion of roof siding windows insulation drywall. Will require electrical and plumbing perm$1Michael Roseactive
50roofing2025-11-18AUSTIN2810 ROCK TERRACE DRTHIS PROJECT INVOLVES THE REINFORCING OF THE EXISTING ROOF REPLACEMENT OF ROOFING AND REPLACEMENT OF REAR DECKING. IT ALSO INCLUDES THE REPLACEMENT OFAdam Boonefinaled
50roofing2025-11-17AUSTIN300 CROCKETT ST UNIT 304Replacement of complete existing central heat and air system with or without duct work OUTDOOR UNIT IS ON ROOF TOPAlbert D'Andreafinaled
50roofing2025-11-07AUSTIN1507 PARKWAYExpress: Remove and replace windows and siding like for like (submitted remodel separate) 1/29/26 SM - REVISED roof was a full replacement with multi$1Lior Shakedfinaled
50roofing2025-11-07AUSTIN2306 ROGGE LNExpress- Roof replacement. Removing old/damaged shingles decking and gutters. Replacing with new decking shingles and gutters.$1Nathan Navarroactive
50roofing2025-11-07AUSTIN3501 ALPINE CIR BLDG BInstallation of solar panels on existing residential roof. 6.16 kW. Addition of 1 0-30A circuits. 14 panels.David Conradactive
50roofing2025-11-04AUSTIN7008 JUNEBERRY CVExpress - Roof Replacement - shingles to standing seam metal roof$1Michael Kastelfinaled
50roofing2025-11-04AUSTIN904 W 22ND HALF STRemoval and replacement of TPO flat roof metal panels and shingles around perimeter.Matthew Quartarofinaled
50roofing2025-10-30AUSTIN1114 TERRY DRExpress: Repairs due to fire damage (siding windows roof insulation drywall flooring cabinetry doors showers painting$1Michael Roseactive
50roofing2025-10-24AUSTIN7202 MARYWOOD CIREmergency Repair 200 AMP Panel Riser and Service Replacement due to storm damageMark Tullierfinaled
50roofing2025-10-02AUSTIN17228 RADIANT DRExpress- Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. BlueJared Vaughtactive
50roofing2025-10-02AUSTIN17240 RADIANT DRExpress: Installation of a 3.68 KW BIPV solar shingle system breaker tie in shingles are nailed to the roof this is a new construction home BluebonneJared Vaughtactive
50roofing2025-10-02AUSTIN17224 RADIANT DRExpress- Installation of a 3.68 kW BIPV solar shingle system. Breaker tie-in. Shingles are nailed to the roof. This is a new construction home. BlueJared Vaughtactive
50roofing2025-10-02AUSTIN17236 RADIANT DRExpress: Installation of a 3.68 KW BIPV solar shingle system breaker tie in shingles are nailed to the roof this is a new construction home BluebonneJared Vaughtactive
50roofing2025-10-02AUSTIN17232 RADIANT DRExpress: Installation of a 3.68 kW BIPV solar shingle system breaker tie in shingles are nailed to the roof This is a new construction home BluebonneJared Vaughtactive
50roofing2025-09-26AUSTIN2104 S L DAVIS AVE UNIT 1BUnit B New construction of 3 story Duplex with roof top uncovered patio 3/2.5Samuel Rojasactive
50roofing2025-09-24AUSTIN6636 W WILLIAM CANNON DR UNIT 317Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged electStephen Abilafinaled
50roofing2025-09-24AUSTIN6636 W WILLIAM CANNON DR UNIT 327Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged electStephen Abilafinaled
50roofing2025-09-23AUSTIN2104 S L DAVIS AVE UNIT 1AUnit A New construction of 3 story Duplex with roof top uncovered patio 3/2.5Samuel Rojasactive
50roofing2025-09-18AUSTIN6636 W WILLIAM CANNON DR UNIT 327Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged electJames Garciafinaled
50roofing2025-09-10AUSTIN809 PARK BLVDExterior: Siding Moisture Barrier Insulation and Roof Repair Electric Plumbing and HVAC update and replacement Interior: Drywall Moving interior wallVictor Puenteactive
50roofing2025-09-09AUSTIN6636 W WILLIAM CANNON DR UNIT 317Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged electJames Garciafinaled
50roofing2025-09-04AUSTIN6502 HICKMAN AVEExpress: Window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sqft of hardie siding$1Yusuf Johnsonactive
50roofing2025-09-04AUSTIN705 W 29TH STRemodel: Repairing water damage mold and tree damage. Building footprint has not changed--same height width and form. Replacing rotten wood and roof.Cordell A. Mayerfinaled
50roofing2025-09-04AUSTIN6506 HICKMAN AVEExpress: Window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sqft of hardie siding$1Yusuf Johnsonactive
50roofing2025-09-04AUSTIN6504 HICKMAN AVEExpress: Window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sqft of hardie siding$1Yusuf Johnsonactive
50roofing2025-08-29AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 24**Michael Garciafinaled
50roofing2025-08-29AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 29**Michael Garciafinaled
50roofing2025-08-29AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 31**Michael Garciafinaled
50roofing2025-08-29AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 20**Michael Garciafinaled
50roofing2025-08-29AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 25**Michael Garciafinaled
50roofing2025-08-29AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 30**Michael Garciafinaled
50roofing2025-08-29AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 28**Michael Garciafinaled
50roofing2025-08-29AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 26**Michael Garciafinaled
50roofing2025-08-29AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 27**Michael Garciafinaled
50roofing2025-08-28AUSTIN705 W 29TH STRemodel: Repairing water damage mold and tree damage. Building footprint has not changed--same height width and form. Replacing rotten wood and roof.Tishay Kingfinaled
50roofing2025-08-27AUSTIN705 W 29TH STRemodel: Repairing water damage mold and tree damage. Building footprint has not changed--same height width and form. Replacing rotten wood and roof.Randy Niemannactive
50roofing2025-08-27AUSTIN4101 JAMES CASEY ST UNIT 100Renovation of 1600 sq ft of an Existing Medical Office Building to Support Equipment Change out. Select Demo of Non-load bearing. Replacement of RoofJames Smithfinaled
50roofing2025-08-26AUSTIN12819 MEEHAN DRRepair Roof Sheathing - Approximately 250 sf Repair/Replace Drywall - moisture/other damage - Approximately 250sf Bathroom - tub/shower surround remod$1derek Kirbyactive
50roofing2025-08-25AUSTIN9205 LEANING ROCK CIRExpress: siding replacement window replacement (like for like) door replacement (like for like exempt) shingle roof/fascia replacement with metal roof$1John Bergeronfinaled
50roofing2025-08-25AUSTIN6636 W WILLIAM CANNON DR UNIT 327Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged electMICHAEL STEWARTfinaled
50roofing2025-08-25AUSTIN6636 W WILLIAM CANNON DR UNIT 317Interior Remodel to Units due to Fire Damage replacing drywall cabinets flooring and finishes: 15 Roof Trusses will be replaced; replace damaged electMICHAEL STEWARTfinaled
50roofing2025-08-25AUSTIN809 PARK BLVDExterior: Siding Moisture Barrier Insulation and Roof Repair Electric Plumbing and HVAC update and replacement Interior: Drywall Moving interior wallCharles Smithactive
50roofing2025-08-23AUSTIN2014 THRASHER LNRepair storm damage pole and service replace pole and build new 200 amp serviceCurry Franksactive
50roofing2025-08-18AUSTIN824 WAGON TRLMetal Roof Replacement for Storage BuildingJeremy Youfinaled
50roofing2025-08-14AUSTIN1200 E RUNDBERG LNInterior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2Brad Sheareractive
50roofing2025-08-13AUSTIN730 W STASSNEY LN UNIT 105Structural and interior repairs following a fire in the suite. Repairs include - replacement of damaged trusses metal roof decking and roof replacemenAnthony Theriotactive
50roofing2025-08-12AUSTIN1004 S MEADOWS DRMetal Roof Replacement for Storage UnitJeremy Youfinaled
50roofing2025-08-05AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 10**Michael Garciafinaled
50roofing2025-08-05AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 6**Michael Garciafinaled
50roofing2025-08-05AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 33**Michael Garciafinaled
50roofing2025-08-05AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 34A**Michael Garciafinaled
50roofing2025-08-05AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 3**Michael Garciafinaled
50roofing2025-08-05AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 9**Michael Garciafinaled
50roofing2025-08-05AUSTIN7581 CHEVY CHASE DRTPO Roof Replacement Shingle **Building 8**Michael Garciafinaled
100 rows shown