Permits
2,814 permits • page 2 of 29
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 65 | roofing | 2026-05-13 | AUSTIN | 1712 E 11TH ST | The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A 1B 1C 1D and 2A and ins | John Robinson | active | |
| 65 | roofing | 2026-05-06 | AUSTIN | 7206 EASTCREST DR | Sewer line replacement of 50 feet We will need to conduct a camera inspection of the line. This will involve accessing the vent stack on the roof to identify the points where both sewer lines exit the building. Once located we will proceed with excavation to reroute both lines that emerge from the house subsequently connecting them and extending to the city tap. | Allen Redmon | active | |
| 65 | roofing | 2026-05-04 | AUSTIN | 2915 E CESAR CHAVEZ ST | ePlan: Commercial Expedited Review - Phase 3B New Construction of Multi Family Res with Res Units Fitness Room Weights Room Sky Lounge Roof Lounge an | Samuel Piedra | active | |
| 65 | roofing | 2026-03-25 | AUSTIN | 6809 WILLAMETTE DR | Interior Remodel New electrical system mechanical system paint flooring interior doors plumbing fixtures & cabinets. New exterior paint and asphalt shingle roof. | $90,000 | David Isaac | active |
| 65 | roofing | 2026-03-07 | AUSTIN | 3817 WESTLAKE DR | Includes replacing cabinetry in the existing boat dock replacing the dock roof and replacing the dock enclosure with no structural modifications. Incl | $90,000 | Jeff Turner | active |
| 65 | roofing | 2026-03-07 | AUSTIN | 3817 WESTLAKE DR | Includes replacing cabinetry in the existing boat dock replacing the dock roof and replacing the dock enclosure with no structural modifications. Include Electrical. | $90,000 | Jeff Turner | active |
| 65 | roofing | 2026-02-26 | AUSTIN | 8600 BELL MOUNTAIN DR | Interior remodel and partial garage and porch enclosures to an existing single-family residence. Scope of work includes a full interior remodel of all rooms including reconfiguration of interior spaces as shown on plans. The project includes enclosing a portion of the existing garage to create a conditioned entry mudroom and laundry room and enclosing a portion of the existing porch adjacent to the primary bedroom to expand the primary suite. Exterior work associated with this project includes replacement of damaged exterior wall sheathing full roof replacement and replacement of all existing windows and exterior doors. | Russell Neal | active | |
| 65 | roofing | 2026-02-23 | AUSTIN | 6605 WEST COURTYARD DR | Interior remodel of existing single-family residence. Scope includes selective removal and reconfiguration of an interior load-bearing wall with engineered beam replacement and construction of a single code-compliant interior step due to existing floor elevation change with minor electrical modifications. No change to building footprint exterior walls roof use or unit count. | James Reese | finaled | |
| 65 | roofing | 2026-02-23 | AUSTIN | 8600 BELL MOUNTAIN DR | Interior remodel and partial garage and porch enclosures to an existing single-family residence. Scope of work includes a full interior remodel of all rooms including reconfiguration of interior spaces as shown on plans. The project includes enclosing a portion of the existing garage to create a conditioned entry mudroom and laundry room and enclosing a portion of the existing porch adjacent to the primary bedroom to expand the primary suite. Exterior work associated with this project includes replacement of damaged exterior wall sheathing full roof replacement and replacement of all existing windows and exterior doors. | Frank Flores | active | |
| 65 | roofing | 2026-02-20 | AUSTIN | 8600 BELL MOUNTAIN DR | Interior remodel and partial garage and porch enclosures to an existing single-family residence. Scope of work includes a full interior remodel of all rooms including reconfiguration of interior spaces as shown on plans. The project includes enclosing a portion of the existing garage to create a conditioned entry mudroom and laundry room and enclosing a portion of the existing porch adjacent to the primary bedroom to expand the primary suite. Exterior work associated with this project includes replacement of damaged exterior wall sheathing full roof replacement and replacement of all existing windows and exterior doors. | $1 | Rusty Stout | active |
| 65 | roofing | 2026-02-18 | AUSTIN | 6801 JESTER BLVD | Replacement of existing deck siding and roof. Partial raising of interior floor. Remodel of deck to match height of interior/avoid entry steps. Slight increase in sqft to accommodate new floor height and deck interface. 2 new 1st floor storage room additions (enclosing courtyard between house and garage | $1 | Nick Chappell | active |
| 65 | roofing | 2026-02-17 | AUSTIN | 6605 WEST COURTYARD DR | Interior remodel of existing single-family residence. Scope includes selective removal and reconfiguration of an interior load-bearing wall with engineered beam replacement and construction of a single code-compliant interior step due to existing floor elevation change with minor electrical modifications. No change to building footprint exterior walls roof use or unit count. | $1 | Thomas Kocis | finaled |
| 65 | roofing | 2026-02-17 | AUSTIN | 1407 W 9TH ST | OPTED INTO HOME - 2ND DWELLING - Existing 2-story structure to remain unless noted otherwise. Full interior renovation Demo of attached carport Renovation of existing balcony Single-story addition @ east side Demo and replacement of existing exterior stair Partial demo + reshaping (net loss of square footage) of existing west faade New roofing | Mark Scarborough | active | |
| 65 | roofing | 2026-01-13 | AUSTIN | 10000 RESEARCH BLVD SVRD SB UNIT 115 | Remodel of existing retail space. Demo front entry and extend it under existing roof on existing foundation to capture 73 additional Sq.Ft. MEP scope. | $78,680 | Holly Platt | finaled |
| 65 | roofing | 2026-01-13 | AUSTIN | 10000 RESEARCH BLVD SVRD SB UNIT 115 | Remodel of existing retail space. Demo front entry and extend it under existing roof on existing foundation to capture 73 additional Sq.Ft. MEP scope. No access control. Awning by separate permit not in scope. Concurrent Review requested | $78,680 | Holly Platt | finaled |
| 65 | roofing | 2026-01-09 | AUSTIN | 1405 S 6TH ST UNIT B | *Partial demo* Interior remodel: full interior remodel of both units; Addition to join existing non-complying duplexes. Common wall to be added. Exterior stairs to become interior/ will be reconfigured. New square footage comes from adjoining both duplexes. New roof too deck/garden. | $150,000 | Garrett Jacobs | active |
| 65 | roofing | 2026-01-09 | AUSTIN | 1405 S 6TH ST UNIT A | *Partial demo* Interior remodel: full interior remodel of both units; Addition to join existing non-complying duplexes. Common wall to be added. Exterior stairs to become interior/ will be reconfigured. New square footage comes from adjoining both duplexes. New roof too deck/garden. | $150,000 | Garrett Jacobs | active |
| 65 | roofing | 2025-11-05 | AUSTIN | 2900 WATER BANK CV | Addn To Exist Sf Residence To Expand Roof And Add Porch Relocate Exist Electrical Fixtures. Amnesty CO. | $46,000 | Gary L. Beam | finaled |
| 65 | roofing | 2025-10-23 | AUSTIN | 2903 OAKHURST AVE | Add New roof dormer interior remodel | $50,000 | CHRISTOPHER LAMBERT | finaled |
| 65 | roofing | 2025-10-15 | AUSTIN | 2611 ADDISON AVE | Express- Reroof; existing decking breaking underfoot; full sheathing (decking) needed replacement | $1 | finaled | |
| 65 | roofing | 2025-10-13 | AUSTIN | 2202 TRAILSIDE DR BLDG B | *Partial demo* Interior remodel converting existing basement to office and converting carport to garage. Adding roof top deck. Changing few windows a | $30,000 | Peter Abendschein | active |
| 65 | roofing | 2025-10-09 | AUSTIN | 2915 E CESAR CHAVEZ ST | ePlan: Commercial Expedited Review - Phase 3B New Construction of Multi Family Res with Res Units Sky Lounge Roof Lounge and Restrooms. ***Phasing - | $100,000,000 | Chris Rembowski | active |
| 65 | roofing | 2025-09-30 | AUSTIN | 5914 LOST HORIZON DR | ePlan: Commercial Expedited Review - Interior Remodel and Addition to Existing Club House. Work to include Expansion of Outdoor Patio with Roof Coveri | $330,000 | Drew Hanish | active |
| 65 | roofing | 2025-07-28 | AUSTIN | 3007 ROGGE LN | express - roof removal sheathing removal and replacement and removal and replacement of all roofing facets | $20,000 | Bryan Swimm | finaled |
| 65 | roofing | 2025-07-10 | AUSTIN | 1835 KRAMER LN BLDG A | Replacement of TPO roof system. New roof system is energy code compliant. There will be no structural work | finaled | ||
| 65 | roofing | 2025-06-26 | AUSTIN | 1835 KRAMER LN BLDG B | Replacement of TPO roof system. New roof system is energy code compliant. There will be no structural work | finaled | ||
| 65 | roofing | 2025-06-25 | AUSTIN | 1307 HARVEY ST | Express: Remove and replace the siding and roof (like for Like) | $47,000 | Angela Bell | finaled |
| 65 | roofing | 2025-05-30 | AUSTIN | 4914 WESTVIEW DR | 5/30/25 SM - SFR Storm damage (Riser meter and MP were detached from the stand alone pole). Replaced weather head and resecured all components. Repa | Craig T. Bryant | finaled | |
| 65 | roofing | 2025-05-08 | AUSTIN | 2013 COVERED WAGON PASS | Remodel Exist Sf Res To Incl Siding & Trim Window Replacement And Gable Roof Mods At Front Roof | $15,000 | Tamara Wallace | finaled |
| 65 | roofing | 2025-05-06 | AUSTIN | 4209 SOUTH INDUSTRIAL DR | Replacement of existing roof system new roof system is energy code compliant. There will be no structural work. | finaled | ||
| 65 | roofing | 2025-05-06 | AUSTIN | 4129 COMMERCIAL CENTER DR | Replacement of existing roof system new roof system is energy code compliant. There will be no structural work. | finaled | ||
| 65 | roofing | 2025-04-28 | AUSTIN | 2810 ROCK TERRACE DR | THIS PROJECT INVOLVES THE REINFORCING OF THE EXISTING ROOF REPLACEMENT OF ROOFING AND REPLACEMENT OF REAR DECKING. IT ALSO INCLUDES THE REPLACEMENT OF | $1 | finaled | |
| 65 | roofing | 2025-03-27 | AUSTIN | 1105 MAUFRAIS ST | Emergency to replace full service loop including meter riser & panel w/like for like. AE shut power off to house due to storm damage this week. 3/26/ | John Coppin | finaled | |
| 65 | roofing | 2025-03-20 | AUSTIN | 3001 COPPER MOUNT CV | ePlan: Residential Expedited Review - Addition Window Replacement And Exterior Remodel To An Existing Single Family Res. Work to include re- roof to | $1 | Trevin Peterson | finaled |
| 65 | roofing | 2025-02-04 | AUSTIN | 3811 E 12TH ST | Replacement of exterior mechanical units roofing membrane and roof rigid insulation clerestory glazing sidewalks improvements new kitchen grease trap | active | ||
| 65 | roofing | 2024-10-29 | AUSTIN | 3904 TONKAWA TRL | Expedited Review - *Partial Demo* Addition to existing 2-Story Duplex to include additional [1bed 1bath] in each unit replacement of Roof Exterior Sid | Fernando Gonzalez | finaled | |
| 65 | roofing | 2024-10-29 | AUSTIN | 11330 FARRAH LN | Shingle Roof Replacement with no structural changes for an Existing Assisted Living Center | finaled | ||
| 65 | roofing | 2024-10-25 | AUSTIN | 3904 TONKAWA TRL | Expedited Review - *Partial Demo* Addition to existing 2-Story Duplex to include additional [1bed 1bath] in each unit replacement of Roof Exterior Sid | Matt Rexing | finaled | |
| 65 | roofing | 2024-10-15 | AUSTIN | 8700 SHOAL CREEK BLVD BLDG TNFM1 | ePlan-Expedited Review: New Construction of a Multi-Family Building. Fire Area 1 - also contains Fitness Club Business Center on Level 2 and Roof Club | $40,000,000 | Eric Taylor | active |
| 65 | roofing | 2024-09-03 | AUSTIN | 2200 ALDRICH ST | Replacement of existing roof system with identical roof system new roof is energy code compliant. There will be no structural work. | finaled | ||
| 65 | roofing | 2024-08-17 | AUSTIN | 6805 BITTEROOT TRL | Express: roof decking board repair and shingle replacement | $1 | finaled | |
| 65 | roofing | 2024-07-17 | AUSTIN | 4207 BLUFFRIDGE DR | Express: Siding/soffit Replacement to Hardie board- coating of the entire home exterior- flat roof replacement insulation and drywall replacement due | $1 | Harold Martinez | active |
| 65 | roofing | 2024-05-15 | AUSTIN | 1859 WESTLAKE DR BLDG BD | Demolish the existing boat dock and build a new one. New boat dock construction 2 stories partial roof cover concrete top deck composite wood lower de | $360,000 | Chris Cockrell | finaled |
| 60 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 3 | Re-roof | Ryan Curtis | active | |
| 60 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 2 | Re-roof | Ryan Curtis | active | |
| 60 | roofing | 2026-09-17 | AUSTIN | 301 E PARMER LN | Commercial reroof. Remove existing roofing system and install new GAF TPO roofing system. | Miguel Juarez | active | |
| 60 | roofing | 2026-09-17 | AUSTIN | 3600 GREYSTONE DR BLDG 4 | Re-roof | Ryan Curtis | active | |
| 60 | roofing | 2026-09-14 | AUSTIN | 8200 CAMERON RD BLDG D | Simple reroof | Jaleel Natour | active | |
| 60 | roofing | 2026-09-14 | AUSTIN | 8200 CAMERON RD BLDG C | Simple Reroof | Jaleel Natour | active | |
| 60 | roofing | 2026-09-14 | AUSTIN | 4256 BERKMAN DR | New solar installation on existing residence roof | Joseph Silver | active | |
| 60 | roofing | 2026-09-04 | AUSTIN | 301 CONGRESS AVE | Reroof overlay with totally adhered Carlisle TPO | Molly Johnston | active | |
| 60 | roofing | 2026-09-02 | AUSTIN | 1109 RUTH AVE | Addition Primary suite and laundry addition raising the roof line on the entire house to increase the pitch and extending the front covered patio. | HERIDO MORALES | active | |
| 60 | roofing | 2026-08-31 | AUSTIN | 3921 BALCONES DR | EXPRESS: We are replacing a garage door that is rotting with a new one. replacing 3 windows in the master bathroom with new ones that are the exact same size and brand. replacing some of the facia shingle mold and soffit around the house as needed due to rot repairing or replacing siding as needed and according to inspection report around the house due to rot. repairing some roof decking above the soffits installing a new composition roof and replacing the old one. replacing 3 air conditioning systems that were at their useful lifespans with high efficiency units replace can bulbs to LED bulbs installing a new tub in the master bath along with a new faucet in same location installing new tile flooring in the master bath installing new countertops/sinks/faucets in the master bath same locations installing a new toilet in master bath same location and repaint the entire house | John Power | active | |
| 60 | roofing | 2026-08-27 | AUSTIN | 10805 HERMOSILLO DR | BLDG 8 - UNIT A TRIPLEX (UNIT 1008-10101044-1046) EACH UNIT WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS AND A ROOF TOP PATIO. | Randy Christianson | active | |
| 60 | roofing | 2026-08-27 | AUSTIN | 9601 S IH 35 SVRD NB | Re-roof/overlay existing metal roof with Duro-Last. No tear-off or structural alterations includes two structures. | Ken Wells | active | |
| 60 | roofing | 2026-08-27 | AUSTIN | 9601 S IH 35 SVRD NB | Re-roof/overlay existing metal roof with Duro-Last. No tear-off or structural alterations-this includes the main building. | Ken Wells | active | |
| 60 | roofing | 2026-08-27 | AUSTIN | 10807 HERMOSILLO DR | BLDG 8 - UNIT A TRIPLEX (UNIT 1008-10101044-1046) EACH UNIT WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS AND A ROOF TOP PATIO. | Randy Christianson | active | |
| 60 | roofing | 2026-08-27 | AUSTIN | 10803 HERMOSILLO DR | BLDG 8 - UNIT A TRIPLEX (UNIT 1008-10101044-1046) EACH UNIT WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS AND A ROOF TOP PATIO. | Randy Christianson | active | |
| 60 | roofing | 2026-08-26 | AUSTIN | 3831 STECK AVE | 1-story addition to existing townhome. Existing Atrium will be converted to a studio. Level existing concrete and erect (1) wall. Add roof to match. (1) existing sliding door will be repurposed as window. Roll in expired permit 2014-066731 MP HVAC change out to exist res. | Jorge Dovalina | active | |
| 60 | roofing | 2026-08-26 | AUSTIN | 8633 THUNDERBIRD RD | Addition remodel to existing 1-story residence remove walls wood deck and existing roof. 4 bed/ 3 bath | Michael Cox | active | |
| 60 | roofing | 2026-08-25 | AUSTIN | 1606 W 14TH ST | Interior remodel of existing 2-story single-family residence with 70 SF conditioned 2nd floor addition (new roof at 2:12 pitch). New uncovered wood deck at rear (272 SF at 50%). Removal of existing pergola carport shed and concrete steps. Two protected trees on site; CRZ tree protection per site plan. | $1 | Armando Munoz | active |
| 60 | roofing | 2026-08-24 | AUSTIN | 1805 BLUEBONNET LN BLDG 1 | ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. Building 1[3bed 2.5bath] Work to include: Second floor addition Third floor addition Covered roof deck addition. | Tamara Enfield | active | |
| 60 | roofing | 2026-08-20 | AUSTIN | 1805 BLUEBONNET LN BLDG 1 | ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. Building 1[3bed 2.5bath] Work to include: Second floor addition Third floor addition Covered roof deck addition. | Todd Cox | active | |
| 60 | roofing | 2026-07-08 | AUSTIN | 8001 S IH 35 SVRD NB BLDG 9 | Replacement of the Existing Roof on Building 9 of a Multi-Family Residential Complex | David Begala | finaled | |
| 60 | roofing | 2026-06-25 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | $1 | Tony Diaz | unknown |
| 60 | roofing | 2026-01-29 | AUSTIN | 3600 PRESIDENTIAL BLVD | Installation of fourteen (14) 40x8 intermodal shipping containers 12 of which will be connected via pre-engineered pre-manufactured roof systems (3 ro | $850,000 | Greg Lagimoniere | active |
| 60 | roofing | 2026-01-29 | AUSTIN | 3600 PRESIDENTIAL BLVD | Installation of fourteen (14) 40x8 intermodal shipping containers 12 of which will be connected via pre-engineered pre-manufactured roof systems (3 roof systems connecting 4 containers each 2 free standing containers) PuPR2 | $850,000 | Greg Lagimoniere | active |
| 60 | roofing | 2026-01-09 | AUSTIN | 4800 HEFLIN LN | Interior remodel repair to existing residential roof and home due to damage from storm and fallen tree repairing residence to the existing floor plan | John Paladino | finaled | |
| 60 | roofing | 2025-12-16 | AUSTIN | 4800 HEFLIN LN | Interior remodel repair to existing residential roof and home due to damage from storm and fallen tree repairing residence to the existing floor plan | $1 | Francisco Burciaga | finaled |
| 60 | roofing | 2025-05-20 | AUSTIN | 3851 AIRPORT BLVD | Roof Replacement for Retail Building: TPO Overlay Roof System No Structural Work Required | finaled | ||
| 60 | roofing | 2025-05-14 | AUSTIN | 979 SPRINGDALE RD BLDG 5 UNIT 120 | Addition to an existing tenant build-out which entails an exterior stair and 4 pickle ball courts on occupied roof. | $40,000 | Peter Barlin | finaled |
| 60 | roofing | 2024-12-06 | AUSTIN | 1801 E 51ST ST BLDG C | Replacement of existing roof system with identical roof system. New roof is energy code compliant. There will be NO structural work. | finaled | ||
| 60 | roofing | 2024-12-06 | AUSTIN | 1801 E 51ST ST BLDG A | Replacement of existing roof system with identical roof system. New roof is energy code compliant. There will be NO structural work. | finaled | ||
| 60 | roofing | 2024-12-05 | AUSTIN | 1801 E 51ST ST BLDG G | Replacement of existing roof system with identical roof system. New roof is energy code compliant. There will be NO structural work. | finaled | ||
| 60 | roofing | 2024-12-05 | AUSTIN | 1801 E 51ST ST BLDG H | Replacement of existing roof system with identical roof system. New roof is energy code compliant. There will be NO structural work. | finaled | ||
| 60 | roofing | 2024-09-23 | AUSTIN | 5700 E RIVERSIDE DR | Various exterior improvements including: Construction of a new pergola at the pool deck; construction of trellises at a courtyard and upstairs roof de | $481,000 | Jack Lozano | finaled |
| 60 | roofing | 2024-08-08 | AUSTIN | 704 NEWCASTLE DR | Express: replace windows vanity reroof cosmetic upgrades Revision: Electrical work | $30,000 | Richard Bond | finaled |
| 55 | roofing | 2026-09-11 | AUSTIN | 1729 E 38TH HALF ST | EXPRESS: Re-Roofing with new decking | $1 | Ami Feller | finaled |
| 55 | roofing | 2026-09-10 | AUSTIN | 11016 ALHAMBRA DR | Completely remove old main service including rag wire. Installing new 200 amp through the roof mast to current code. | Ronald Norwood | active | |
| 55 | roofing | 2026-09-08 | AUSTIN | 4825 DAVIS LN BLDG 17 | simple re-roof - remove and replace shingles on existing roof. BLDG 17 | Brad Davis | active | |
| 55 | roofing | 2026-09-08 | AUSTIN | 4825 DAVIS LN BLDG 18 | simple re-roof - remove and replace shingles on existing roof. BLDG 18 | Brad Davis | active | |
| 55 | roofing | 2026-09-01 | AUSTIN | 11008 JORDAN LN | Replacing the shingles of the roof removing pantry removing 1 bedroom closet removing and replacing a bearing wall with a 16 ft x 1 ft beam. Converting some of the garage to habitable space proposed 221 SF. | $1 | Suzie Alcivar | active |
| 55 | roofing | 2026-08-27 | AUSTIN | 10816 WARDOUR LN | Express: Re-roofing (located in WUI) | $1 | Drew Proctor | finaled |
| 55 | roofing | 2026-08-19 | AUSTIN | 10817 RIVER PLANTATION DR | Express: Wui zone C reroofing with Class a Fire Roofing Material- Owens Coming Duration shingles and OC underlayment mesh in ventilation. | $1 | Fareed Tulbah | finaled |
| 55 | roofing | 2026-08-18 | AUSTIN | 4110 AVENUE C | Interior Remodel of an existing two-story single-family residence with no change to building footprint condition area roof height or exterior envelope - no exterior window door-opening wall or roof. | $1 | Josh Reed | active |
| 55 | roofing | 2026-08-18 | AUSTIN | 1109 RUTH AVE | Addition Primary suite and laundry addition raising the roof line on the entire house to increase the pitch and extending the front covered patio. | $1 | Phillip L. Nicolosi | active |
| 55 | roofing | 2026-08-18 | AUSTIN | 1307 LOMA DR | New construction single-family residential 3-story 4 bedroom 2.5 bath with attached 2-car garage covered front porch 3rd floor uncovered roof deck and uncovered wood deck. | Artemio Galeana | active | |
| 55 | roofing | 2026-08-14 | AUSTIN | 1307 LOMA DR | New construction single-family residential 3-story 4 bedroom 2.5 bath with attached 2-car garage covered front porch 3rd floor uncovered roof deck and uncovered wood deck. | $0 | Ryan Herrman | active |
| 55 | roofing | 2026-08-11 | AUSTIN | 203 NELRAY BLVD | Emergency repair of damaged overhead service. Falling tree limb damaged non-code compliant overhead drop service riser wire. Replaced meter base install thru the roof rigid conduit riser istall supplemental grounding and whole house SPD. | Timothy R. Putman | finaled | |
| 55 | roofing | 2026-07-30 | AUSTIN | 8933 IVEANS CV | Addition/ remodel of 1 story SFR Construct a 455 SF addition and minor interior remodel including new foundation framing roofing drywall flooring cabinetry new electrical fixtures and wiring and new plumbing fixtures. No major demolition. | $1 | Taylor Ramsey | active |
| 55 | roofing | 2026-07-29 | AUSTIN | 3921 BALCONES DR | EXPRESS: We are replacing a garage door that is rotting with a new one. replacing 3 windows in the master bathroom with new ones that are the exact same size and brand. replacing some of the facia shingle mold and soffit around the house as needed due to rot repairing or replacing siding as needed and according to inspection report around the house due to rot. repairing some roof decking above the soffits installing a new composition roof and replacing the old one. replacing 3 air conditioning systems that were at their useful lifespans with high efficiency units replace can bulbs to LED bulbs installing a new tub in the master bath along with a new faucet in same location installing new tile flooring in the master bath installing new countertops/sinks/faucets in the master bath same locations installing a new toilet in master bath same location and repaint the entire house | Paul A Moebus | active | |
| 55 | roofing | 2026-07-28 | AUSTIN | 3921 BALCONES DR | EXPRESS: We are replacing a garage door that is rotting with a new one. replacing 3 windows in the master bathroom with new ones that are the exact same size and brand. replacing some of the facia shingle mold and soffit around the house as needed due to rot repairing or replacing siding as needed and according to inspection report around the house due to rot. repairing some roof decking above the soffits installing a new composition roof and replacing the old one. replacing 3 air conditioning systems that were at their useful lifespans with high efficiency units replace can bulbs to LED bulbs installing a new tub in the master bath along with a new faucet in same location installing new tile flooring in the master bath installing new countertops/sinks/faucets in the master bath same locations installing a new toilet in master bath same location and repaint the entire house | $1 | Sam Stewart | active |
| 55 | roofing | 2026-07-20 | AUSTIN | 4205 RAMSEY AVE | Renovate existing 1-story ADU: Replace windows doors siding & roofing. Update MEP. Reconfigure floor plan/plumbing locations. Replace foundation in exact same footprint as existing. | Jose A. Martinez | active | |
| 55 | roofing | 2026-07-17 | AUSTIN | 3831 STECK AVE | 1-story addition to existing townhome. Existing Atrium will be converted to a studio. Level existing concrete and erect (1) wall. Add roof to match. (1) existing sliding door will be repurposed as window. Roll in expired permit 2014-066731 MP HVAC change out to exist res. | $1 | Manuel De Lara | active |
| 55 | roofing | 2026-07-15 | AUSTIN | 11108 BEXLEY LN | New 1-story detached stand-alone bathroom 8x10 single slope roof containing plumbing/electrical. | $0 | active | |
| 55 | roofing | 2026-07-15 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: Demo of majority of exterior walls First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | $1 | Tony Diaz | active |
| 55 | roofing | 2026-07-15 | AUSTIN | 3604 LUCAS DR | INTERIOR plumbing updates Structural wall modifications to accommodate a new floor plan Minor exterior framing adjustments at the front entry New roof installation to decking 8/25/26 SM ** REVISED: Interior only majority of house will receive new electrical multiple walls only have lower have of sheetrock removed full bath remodels. The deck and front entry are on a different permit. | HERIDO MORALES | active | |
| 55 | roofing | 2026-07-15 | AUSTIN | 3604 LUCAS DR | INTERIOR plumbing updates Structural wall modifications to accommodate a new floor plan Minor exterior framing adjustments at the front entry New roof installation to decking 8/25/26 SM ** REVISED: Interior only majority of house will receive new electrical multiple walls only have lower have of sheetrock removed full bath remodels. The deck and front entry are on a different permit. | Miguel Vargas | active | |
| 55 | roofing | 2026-07-13 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: Demo of majority of exterior walls First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | Hung Pham | active | |
| 55 | roofing | 2026-07-13 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: Demo of majority of exterior walls First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | Hung Pham | active |