Permits
2,636 permits • page 15 of 27
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 40 | solar | 2026-06-01 | AUSTIN | 9707 CHERYL LYNN RD | Dominguez/Loera - 39-64677 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. Requesting wire pull. | Mark Bedell | finaled | |
| 40 | solar | 2026-06-01 | AUSTIN | 2607 W BRAKER LN | Installing 133.65 KW Solar System with 243 ALEX 550 W panels and 2 SCA60KTL Do us 480 inverters | Ortiz Moses | finaled | |
| 40 | solar | 2026-06-01 | AUSTIN | 3708 LAUREL LEDGE LN | Disconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size. Address has a (solar) Aux permit 26-060406. 400 amp Transocket service. | Chadwyck Preece | finaled | |
| 40 | solar | 2026-05-29 | AUSTIN | 9205 ASHEVILLE PL | Removal/reinstallation of existing solar system. AE. No changes being made. | Wesley Davis | active | |
| 40 | solar | 2026-05-29 | AUSTIN | 7502 NORTHCREST BLVD | Stand alone electrical permit for a pole mounted meter rack. Relocation of Service Entrance: The main electrical service will be moved from the structure to a new pole-mounted service rack in the backyard still fed via overhead. This rack will host the utility meter the solar meter and the Main Disconnect feeding the houses main panel via a new underground line. The parent permit associated with this rack permit is: 2025-084893 EP for 7502 Northcrest Blvd Austin TX 78752 | Zachry Wood | active | |
| 40 | solar | 2026-05-28 | AUSTIN | 1141 CHICON ST BLDG 3 | Rooftop solar. No battery energy storage. Lineside tap interconnection. Aux EP needed. Remodel EP not needed. Multifamily Affordable Housing. | Mark Pride | finaled | |
| 40 | solar | 2026-05-26 | AUSTIN | 13649 RUTLEDGE SPUR BLDG 1 | Rooftop Solar Line Side Tap Interconnection | Jeff Bendall | active | |
| 40 | solar | 2026-05-26 | AUSTIN | 13649 RUTLEDGE SPUR BLDG 2 | SMART housing. Rooftop Solar. Line side tap interconnection. | Jeff Bendall | active | |
| 40 | solar | 2026-05-21 | AUSTIN | 14533 DONALD DR | Harrell - 39-65378- Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. requesting wire pull | Mark Bedell | finaled | |
| 40 | solar | 2026-05-19 | AUSTIN | 3201 MAYWOOD AVE | Pre-wire for solar. | Chadwyck Preece | finaled | |
| 40 | solar | 2026-05-18 | AUSTIN | 8404 VAQUERO CV | Installation of 8.1kw PV Solar system. | Michael Novak | finaled | |
| 40 | solar | 2026-05-13 | AUSTIN | 8722 BIRMINGHAM DR | Worley - 39-51616 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. EC is requesting wire pull | Mark Bedell | finaled | |
| 40 | solar | 2026-05-12 | AUSTIN | 6320 EL MIRANDO ST | Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _125__ Main Breaker only. Cox - 39-57490 | Mark Bedell | finaled | |
| 40 | solar | 2026-05-11 | AUSTIN | 14805 EARL GREY LN | General work on existing solar system. No other work being performed. | Chadwyck Preece | active | |
| 40 | solar | 2026-05-11 | AUSTIN | 4003 WALNUT CLAY DR | Generator installation 5/18/26 SM - REVISED ** Ankor Solix Battery Module ATS install | Spencer Bowman | active | |
| 40 | solar | 2026-05-08 | AUSTIN | 10704 PRATT LN | Removal/reinstallation of existing solar system. AE. No changes being made. | Wesley Davis | active | |
| 40 | solar | 2026-05-07 | AUSTIN | 7308 GRASS CV | Installation of 7.04kw PV Solar system. | Michael Novak | finaled | |
| 40 | solar | 2026-05-07 | AUSTIN | 1141 CHICON ST BLDG 2 | QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection Aux EP needed. Remodel EP not needed. Existing multi family - OVA | Mark Pride | finaled | |
| 40 | solar | 2026-05-07 | AUSTIN | 1141 CHICON ST BLDG 3 | Rooftop solar. No battery energy storage. Lineside tap interconnection. Aux EP needed. Remodel EP not needed. Multifamily Affordable Housing. | Mark Pride | finaled | |
| 40 | solar | 2026-05-06 | AUSTIN | 1000 E 41ST ST | Install new 100.00 KWDC Rooftop solar system servicing existing commercial. | RON PHIPPS | active | |
| 40 | solar | 2026-05-06 | AUSTIN | 13102 GEARY DR | Installation of a 8.2 solar panels system with Panel Q. PEAK DUO BLK ML-G10.C+ 410W (x20) (20) Enphase IQ8HC Domestic | Logan Stone | finaled | |
| 40 | solar | 2026-05-05 | AUSTIN | 12513 ENCHANTED FOREST DR | REQUEST TO DISCONNECT. Installing a 26.136 kW PV system and (2) Tesla Inc. 1707000-XX-Y inverters/batteries. | Michael Solano | finaled | |
| 40 | solar | 2026-05-05 | AUSTIN | 7301 TRACE CHAIN DR | Hafezizadeh-Kelbaugh - 39-49689 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. underground wire pull | Mark Bedell | active | |
| 40 | solar | 2026-05-04 | AUSTIN | 4112 MEDICAL PKWY | Rooftop Solar with Line Side Tap Interconnection. | Mark Pride | finaled | |
| 40 | solar | 2026-04-30 | AUSTIN | 5908 MOUNTAINCLIMB DR | Prewire for Solar | Mark Pride | finaled | |
| 40 | solar | 2026-04-30 | AUSTIN | 11308 MONET DR | Installing 9.68 kW DC solar with ESS PEC | Mark Pride | finaled | |
| 40 | solar | 2026-04-30 | AUSTIN | 6201 HIGHLAND HILLS DR | **REQUEST TO DISCONNECT** We will conduct a service upgrade from a 150amp meter can to a 200amp meter can as there is a 200 amp main panel currently installed. This permit is linked to permit # 2026-052525 EP as we are also installing a 9.90KW solar system. | Genaro Briones | finaled | |
| 40 | solar | 2026-04-29 | AUSTIN | 6805 WEST COURTYARD DR | Prewire for 18.48 kW DC solar system | Mark Pride | finaled | |
| 40 | solar | 2026-04-27 | AUSTIN | 3101 FOXTON CV | Mahoney - 39-62289 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 125 Amp Main Breaker. Upgrading revenue meter to | Mark Bedell | finaled | |
| 40 | solar | 2026-04-27 | AUSTIN | 1141 CHICON ST BLDG 2 | QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection Aux EP needed. Remodel EP not needed. Existing multi family - OVA | Jeff Bendall | finaled | |
| 40 | solar | 2026-04-27 | AUSTIN | 3101 FOXTON CV | Mahoney - 39-62289 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 125 Amp Main Breaker. Upgrading revenue meter to 200 Amps. | Mark Bedell | finaled | |
| 40 | solar | 2026-04-22 | AUSTIN | 1200 BRUS BND | Disconnect and reconnect meter to install battery backup. Install new main service disconnect. Aux Electrical Permit # 2026-047904 EP | Martin Rodriguez | finaled | |
| 40 | solar | 2026-04-22 | AUSTIN | 1703 CLIFFSIDE DR | Backup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job comple | Martin Rodriguez | active | |
| 40 | solar | 2026-04-22 | AUSTIN | 701 LITTLE OAK DR | Zappen 39-58964 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker Upgrading revenue meter to 2 | Mark Bedell | finaled | |
| 40 | solar | 2026-04-22 | AUSTIN | 1703 CLIFFSIDE DR | Disconnect and reconnect meter to install battery backup. Aux Electrical Permit # 2026-048492 EP | Martin Rodriguez | finaled | |
| 40 | solar | 2026-04-22 | AUSTIN | 1907 TRAVIS HEIGHTS BLVD | Disconnect and reconnect meter to install battery backup. Aux Electrical Permit # 2026-041437 EP | Martin Rodriguez | finaled | |
| 40 | solar | 2026-04-22 | AUSTIN | 900 SPRINGDALE RD | Install a pergola with solar panels attached to the top | Jeffrey Shed | active | |
| 40 | solar | 2026-04-22 | AUSTIN | 701 LITTLE OAK DR | Zappen 39-58964 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker Upgrading revenue meter to 200 Amps ONLY. | Mark Bedell | finaled | |
| 40 | solar | 2026-04-22 | AUSTIN | 1703 CLIFFSIDE DR | Backup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion. | Martin Rodriguez | active | |
| 40 | solar | 2026-04-21 | AUSTIN | 1311 ALTA VISTA AVE BLDG A | This is for a battery backup system with automatic transfer switch. | Martin Rodriguez | active | |
| 40 | solar | 2026-04-21 | AUSTIN | 1141 CHICON ST BLDG 3 | Rooftop solar. No battery energy storage. Lineside tap interconnection. Aux EP needed. Remodel EP not needed. Multifamily Affordable Housing. | Jeff Bendall | finaled | |
| 40 | solar | 2026-04-20 | AUSTIN | 7300 COOPER LN | iNSTALL SOLAR FOR EXISTING RESIDENCE | Christopher Cibulka | finaled | |
| 40 | solar | 2026-04-20 | AUSTIN | 7300 COOPER LN | Rebuilding electrical service to current code for solar meter interconnect | Christopher Cibulka | finaled | |
| 40 | solar | 2026-04-20 | AUSTIN | 12904 DEBARR DR | Horne - 39-56969 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200amp Main Breaker. Upgrading revenue meter to 20 | Mark Bedell | finaled | |
| 40 | solar | 2026-04-20 | AUSTIN | 6510 MIDDLEHAM PL | Price 39-59708 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading subpanel and revenue | Mark Bedell | finaled | |
| 40 | solar | 2026-04-20 | AUSTIN | 12904 DEBARR DR | Horne - 39-56969 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200amp Main Breaker. Upgrading revenue meter to 200 Amps. | Mark Bedell | finaled | |
| 40 | solar | 2026-04-20 | AUSTIN | 6510 MIDDLEHAM PL | Price 39-59708 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading subpanel and revenue meter to 200 Amps. | Mark Bedell | finaled | |
| 40 | solar | 2026-04-17 | AUSTIN | 10610 SIERRA OAKS | Disconnect and reconnect meter to install battery backup. Aux Electrical Permit #: 2026-043420 EP | Martin Rodriguez | finaled | |
| 40 | solar | 2026-04-17 | AUSTIN | 3201 CATALINA DR | Installing (1) Tesla PW3 Battery and a Main Panel Upgrade (SPAN). | Michael Solano | finaled | |
| 40 | solar | 2026-04-16 | AUSTIN | 3301 DOLPHIN CV UNIT 2 | Prewire for Solar | Mark Pride | finaled | |
| 40 | solar | 2026-04-16 | AUSTIN | 8304 JANCY DR | General work on existing solar system. No other work being performed. | Chadwyck Preece | finaled | |
| 40 | solar | 2026-04-15 | AUSTIN | 6623 GREENSBORO DR | Pennick 39-48486 - Disconnect/reconnect power to move rev meter up to minimum required height. We will tie in PV component to existing MSP _200__ Amp | Mark Bedell | finaled | |
| 40 | solar | 2026-04-15 | AUSTIN | 6623 GREENSBORO DR | Pennick 39-48486 - Disconnect/reconnect power to move rev meter up to minimum required height. We will tie in PV component to existing MSP _200__ Amps. _200__ Main Breaker only. | Mark Bedell | finaled | |
| 40 | solar | 2026-04-13 | AUSTIN | 10610 SIERRA OAKS | Backup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job comple | Martin Rodriguez | active | |
| 40 | solar | 2026-04-13 | AUSTIN | 10610 SIERRA OAKS | Backup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion. | Martin Rodriguez | active | |
| 40 | solar | 2026-04-10 | AUSTIN | 1907 TRAVIS HEIGHTS BLVD | Backup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job comple | Martin Rodriguez | active | |
| 40 | solar | 2026-04-10 | AUSTIN | 2400 TRAIL OF MADRONES | We want to install a Battery at this residence. We will be installing downstream of main service disconnect. | Martin Rodriguez | active | |
| 40 | solar | 2026-04-10 | AUSTIN | 1907 TRAVIS HEIGHTS BLVD | Backup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion. | Martin Rodriguez | active | |
| 40 | solar | 2026-04-08 | AUSTIN | 704 FORT CHADBOURNE DR | REQUEST TO DISCONNECT - Davis/Gonzales 39-52582 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breake | Mark Bedell | finaled | |
| 40 | solar | 2026-04-08 | AUSTIN | 8104 PARKDALE DR | Lyon - 39-53920 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker. Upgrading revenue meter to 200 Am | Mark Bedell | finaled | |
| 40 | solar | 2026-04-08 | AUSTIN | 5703 BOULDER CREEK | REQUEST TO DISCONNECT - Gillespie 39-53602 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker. | Mark Bedell | finaled | |
| 40 | solar | 2026-04-08 | AUSTIN | 8104 PARKDALE DR | Lyon - 39-53920 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker. Upgrading revenue meter to 200 Amps full service upgrade for the meter the subpanel and the meter. | Mark Bedell | finaled | |
| 40 | solar | 2026-04-08 | AUSTIN | 704 FORT CHADBOURNE DR | REQUEST TO DISCONNECT - Davis/Gonzales 39-52582 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. | Mark Bedell | finaled | |
| 40 | solar | 2026-04-07 | AUSTIN | 8301 JOHNNY MORRIS RD | Installation of 368.16 kW rooftop PV system | Chadwyck Preece | active | |
| 40 | solar | 2026-04-07 | AUSTIN | 8301 JOHNNY MORRIS RD | Installation of 247.24 kW rooftop PV system | Chadwyck Preece | active | |
| 40 | solar | 2026-04-07 | AUSTIN | 8301 JOHNNY MORRIS RD | Installation of 198.24 kW rooftop PV system | Chadwyck Preece | active | |
| 40 | solar | 2026-04-07 | AUSTIN | 8301 JOHNNY MORRIS RD | INstallation of 331.58 kW rooftop PV system | Chadwyck Preece | active | |
| 40 | solar | 2026-04-07 | AUSTIN | 3005 WESTLAKE DR | Express- Rooftop solar panels tilted up (not aligned with roof plane). Aux Power permit 2024-126200 EP (No PV at the request of the applicant). | $1 | Jeff Bendall | finaled |
| 40 | solar | 2026-04-07 | AUSTIN | 1304 W OLTORF ST | Installation of 29.10 KW Rooftop PV System for Existing Office/Warehouse | Chadwyck Preece | active | |
| 40 | solar | 2026-04-06 | AUSTIN | 8904 TRONEWOOD DR | Installation new 4.4kw solar DC system with new 11.92kwh energy storage system . Installation new 125A Service sub panel | Mark Barylski | active | |
| 40 | solar | 2026-04-06 | AUSTIN | 12513 ENCHANTED FOREST DR | REQUEST TO DISCONNECT. Installing a 26.136 kW PV system and (2) Tesla Inc. 1707000-XX-Y inverters/batteries. | Michael Solano | finaled | |
| 40 | solar | 2026-04-02 | AUSTIN | 10205 VAQUERO TRL | Installation of 7.6kw PV Solar system. | Michael Novak | finaled | |
| 40 | solar | 2026-04-02 | AUSTIN | 741 DALTON LN | Installation of 60.72 kW solar panel system on existing metal structure. I was instructed by commercial permit review to file for an AUX permit for th | Robert Krous | active | |
| 40 | solar | 2026-03-26 | AUSTIN | 2904 MONTEBELLO CT | Replace a 200 amp breaker to a 150 amp main breaker per the solar inspector and possibly a new meter can NO OTHER WORK this job has previous passed fi | Eduardo Martell | finaled | |
| 40 | solar | 2026-03-26 | AUSTIN | 2904 MONTEBELLO CT | Replace a 200 amp breaker to a 150 amp main breaker per the solar inspector and possibly a new meter can NO OTHER WORK this job has previous passed final inspection Austin energy solar inspector requested lowing the 200 amp to a 150 amp breaker in the outside main electrical service. | Eduardo Martell | finaled | |
| 40 | solar | 2026-03-25 | AUSTIN | 3106 E 14TH HALF ST | Solar panels for existing church. No Meter review needed. | Lavelle Chandler | active | |
| 40 | solar | 2026-03-25 | AUSTIN | 3106 E 14TH HALF ST | Solar panels for existing church. No Meter review needed. This project is being installed for the following AE Account + UNIT # (even though the addr | Lavelle Chandler | active | |
| 40 | solar | 2026-03-18 | AUSTIN | 11700 COYOTE CALL WAY | We plan to install 4.840 KW DC ROOF MOUNT SOLAR PV SYSTEM WITH 11 - HYUNDAI SOLAR: HiS-T440NF(BK) 440W PV MODULES WITH 11 - ENPHASE IQ8A-72-2-US 349W | Phillip Thompson | finaled | |
| 40 | solar | 2026-03-18 | AUSTIN | 11700 COYOTE CALL WAY | We plan to install 4.840 KW DC ROOF MOUNT SOLAR PV SYSTEM WITH 11 - HYUNDAI SOLAR: HiS-T440NF(BK) 440W PV MODULES WITH 11 - ENPHASE IQ8A-72-2-US 349W MICRO INVERTERS EQUIPPED WITH RAPID SHUTDOWN | Phillip Thompson | finaled | |
| 40 | solar | 2026-03-17 | AUSTIN | 14620 LAKE VICTOR DR | ROOFTOP SOLAR WITH BACKUP BATTERY ONCOR Energy | Paul Joyce | finaled | |
| 40 | solar | 2026-03-12 | AUSTIN | 5717 MC CARTY LN | Installation of 8.8kW Solar PV System | Michael Novak | finaled | |
| 40 | solar | 2026-03-11 | AUSTIN | 6601 ROTAN DR | Ang 39-38414 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _125__ Main Breaker. Upgrading revenue meter to 200 | Mark Bedell | finaled | |
| 40 | solar | 2026-03-11 | AUSTIN | 1314 ROCKCLIFF RD | Installation of 33.82 kW roof mounted solar system + 7 Powerwall 3 Batteries + 3 Powerwall 3 Expansions + 2 SPAN Panels | Joungho Choi | active | |
| 40 | solar | 2026-03-11 | AUSTIN | 6601 ROTAN DR | Ang 39-38414 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _125__ Main Breaker. Upgrading revenue meter to 200 Amps ONLY. | Mark Bedell | finaled | |
| 40 | solar | 2026-03-10 | AUSTIN | 9928 THANE WAY | Installation of Roof Mounted 9.03kW Solar System. 21x SEG 430 Panels & 1x Tesla Powerwall 3. | William Johnson | finaled | |
| 40 | solar | 2026-03-06 | AUSTIN | 3106 E 14TH HALF ST | Solar panels for existing church. | Lavelle Chandler | active | |
| 40 | solar | 2026-03-06 | AUSTIN | 6308 TOSCANA AVE | Disconnect and reconnect meter to install battery backup system Ref: AUX 2026-023493 EP | Martin Rodriguez | finaled | |
| 40 | solar | 2026-03-06 | AUSTIN | 3106 E 14TH HALF ST | Solar panels for existing church. **Replace damaged weather head upsize wire size | Lavelle Chandler | finaled | |
| 40 | solar | 2026-03-05 | AUSTIN | 6308 TOSCANA AVE | We want to install a Battery at this residence. | Martin Rodriguez | active | |
| 40 | solar | 2026-03-05 | AUSTIN | 8100 TIFFANY DR | Day 39-39387 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _125__ Amps. _125__ Main Breaker. Upgrading revenue meter to 20 | Mark Bedell | finaled | |
| 40 | solar | 2026-03-05 | AUSTIN | 8100 TIFFANY DR | Day 39-39387 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _125__ Amps. _125__ Main Breaker. Upgrading revenue meter to 200 Amps ONLY. | Mark Bedell | finaled | |
| 40 | solar | 2026-03-03 | AUSTIN | 9600 ANGELWYLDE DR | Install roof-mounted solar system: TOTAL INSTALL; 38.92kW - 92x RUNERGY 410w PV Modules (HY-DH108P8) with 6x Savant Power Inverters (PS-INV 12.5kW-100 | RICKEY YATES | active | |
| 40 | solar | 2026-03-03 | AUSTIN | 6803 BREEZY HILL DR | The previous contractor for the PV system that was installed never pulled a permit and the system was never commissioned. We are making corrections to | JEREMIE BRANTON | active | |
| 40 | solar | 2026-03-03 | AUSTIN | 9600 ANGELWYLDE DR | Install roof-mounted solar system: TOTAL INSTALL; 38.92kW - 92x RUNERGY 410w PV Modules (HY-DH108P8) with 6x Savant Power Inverters (PS-INV 12.5kW-100a) and 6x Savant Power Storage Batteries (PS20-BATT-20kW-ENCL) and 92x Rapid Shutdown APSMART RSD-S-PLC devices | RICKEY YATES | active | |
| 40 | solar | 2026-03-03 | AUSTIN | 6803 BREEZY HILL DR | The previous contractor for the PV system that was installed never pulled a permit and the system was never commissioned. We are making corrections to their installation and then will need to have inspections. | JEREMIE BRANTON | finaled | |
| 40 | solar | 2026-02-26 | AUSTIN | 9604 ANGELWYLDE DR | Install roof-mounted solar system: 49.61kW - 121x RUNERGY 410w PV Modules (HY-DH108P8) with 4x Savant Power Inverters (PS-INV-12.5kW-100a) and 2x Sava | RICKEY YATES | active | |
| 40 | solar | 2026-02-26 | AUSTIN | 9604 ANGELWYLDE DR | Install roof-mounted solar system: 49.61kW - 121x RUNERGY 410w PV Modules (HY-DH108P8) with 4x Savant Power Inverters (PS-INV-12.5kW-100a) and 2x Savant Power Storage Batteries (PS20-BATT-20kW-ENCL) and 121x Rapid Shutdown APSMART RSD-S-PLC devices | RICKEY YATES | active | |
| 40 | solar | 2026-02-25 | AUSTIN | 8005 BRAMBLE BUSH DR | REQUEST TO DISCONNECT - Dilworth - 39-37629 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 125 amp Main Breaker. | Mark Bedell | finaled | |
| 40 | solar | 2026-02-25 | AUSTIN | 12513 ENCHANTED FOREST DR | Installing a 26.136 kW PV system and (2) Tesla Inc. 1707000-XX-Y inverters/batteries. | Michael Solano | finaled | |
| 40 | solar | 2026-02-25 | AUSTIN | 1304 W OLTORF ST | Installation of 29.10 KW Rooftop PV System for Existing Office/Warehouse | Chadwyck Preece | active |