40solar2026-08-07AUSTIN8100 PARKDALE DRDisconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps bus rating /125 amps Main Breaker rating. Upgrading revenue meter to 200 Amps.Mark Bedellfinaled
40solar2026-08-06AUSTIN1200 HAWKS CANYON CIRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-06AUSTIN12313 LITTLE EMILY WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-08-06AUSTIN11803 INDIANHEAD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-08-05AUSTIN4907 TENISON CTDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.Chadwyck Preeceactive
40solar2026-08-05AUSTIN8706 BROOKFIELD DRInstallation of 6.16kw Solar PV systemMichael Novakfinaled
40solar2026-08-04AUSTIN2400 SPANISH CAMP CVRelocation of Load-Side Tap to Line-Side Tap for existing solar generation system. No other system changes.Secoya Rittenberryfinaled
40solar2026-08-04AUSTIN11604 MURANO DRSOLAR PANEL SYSTEM WITH A SYSTEM SIZE OF 6.56 Q.PEAK DUO BLK ML-G10.C+ 410W (x16) AND Enphase microinverters (x16)Logan Stonefinaled
40solar2026-08-04AUSTIN1606 NILES RDNew pool (with plumbing permit). New Battery Backup 336 SF New generator enclosure 259 SF.$1Hugo Reynoldsactive
40solar2026-08-03AUSTIN1341 W MARY ST BLDG 1Installing 130.35 kW Solar System with 237ALEX-550-W panels and 2 CPS SCA60KTL-DO/US-480.James Hiebertactive
40solar2026-08-03AUSTIN11717 RAILTON DRMichel - 39-81052 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. Requesting wire pull.Mark Bedellfinaled
40solar2026-08-03AUSTIN5916 CAPE CORAL DRInstallation of 24.92 kW roof mounted solar system and (2) Tesla Powerwall 3 BatteriesJoungho Choiactive
40solar2026-08-03AUSTIN1204 WARRINGTON DRGritsch 39-91993 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker. Upgrading revenue meter to 200 Amps. Upgrading subpanel to 200 amps. Underground service requesting wire pull.Mark Bedellfinaled
40solar2026-07-30AUSTIN2303 SUNNY SLOPE DR7.36kW rooftop solar installMark Pridefinaled
40solar2026-07-30AUSTIN7300 SAGE OAK TRLRequest to disconnect and reconnect. TruTec will be moving PV meter over 1 ft to the rightDaniel Perezactive
40solar2026-07-29AUSTIN6607 MESA HOLLOW DRRemoval/reinstallation of existing solar system. AE. No changes being made.Wesley Davisactive
40solar2026-07-29AUSTIN4712 STAR JASMINE DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN6507 MESA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN11604 MURANO DRTEMPORARY DISCONNECT/RECONNECTION REQUEST FOR ENPHASE BATTERYLogan Stonefinaled
40solar2026-07-29AUSTIN2643 BARTON HILLS DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-07-29AUSTIN1712 BAY HILL DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN5303 BUFFALO PASSBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN7511 SHADYWOOD DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN8211 SPRING VALLEY DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN3608 ATLAS CVBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN2411 QUARRY RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-29AUSTIN2007 RICHCREEK RDBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-28AUSTIN6602 LUCKENBACH LNDisconnect/reconnect to tie in pv/ESS components. No upgrade to service or meter size. GENERAC 22 KW AIR-COOLED STANDBY GENERATOR (MODEL #G007260-0)Chadwyck Preeceactive
40solar2026-07-28AUSTIN9102 WAMPTON WAYBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-07-28AUSTIN7709 MESA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-28AUSTIN6220 TOSCANA AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-07-28AUSTIN3966 SENDERO DR4.14 kW rooftop solar installation to replace existingMark Prideactive
40solar2026-07-28AUSTIN1424 PRESTON AVEBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-07-27AUSTIN8904 FALLKILL DRInstall new roof-mounted solar system energy storage system an EV Wall Connector to existing residence. BluebonnetWesley Davisfinaled
40solar2026-07-27AUSTIN12502 FALLEN TOWER LNContreras - 39-90125 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. Requesting wire pull.Mark Bedellfinaled
40solar2026-07-27AUSTIN1835 KRAMER LN BLDG B UNIT 100Rooftop Solar with Line Side Tap Interconnection.Mark Pridefinaled
40solar2026-07-24AUSTIN2203 1/2 W 35TH STAT&T Proposes: Tower SOW - Remove (3) B2 & B66 RRU Radios (3) TMAS (3) Diplexers (10) 50A Coax Cables. Relocate: (3) Air Antennas (3) B30 RRU Radios. Install: Mount modification per mount analysis. (3) Air antennas (3) B25/B66 RRU Radios. Ground SOW: Remove (6) Diplexers (4) -48-24V Converters (1) 48V Battery Rack (12) 48V 194aH Batteries (6) 50A DC breakers. Existing cell tower.Antonio Morenoactive
40solar2026-07-24AUSTIN7100 MESA DRBASE: Installing a backup battery system and additional meter socket.Martin Rodriguezactive
40solar2026-07-24AUSTIN304 W CADDO ST39-90606 - Childs - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps.Mark Bedellactive
40solar2026-07-22AUSTIN2109 GRISWOLD LNPrewire for SolarMark Pridefinaled
40solar2026-07-22AUSTIN8134 MESA DR UNIT BRooftop Solar Line side tap interconnection - Building BMark Prideactive
40solar2026-07-22AUSTIN1705 PALO DURO RDExpanding Solar System Additional 9.24kWMichael Novakfinaled
40solar2026-07-21AUSTIN1835 KRAMER LN BLDG B UNIT 100Rooftop Solar with Line Side Tap Interconnection.Mark Pridefinaled
40solar2026-07-21AUSTIN10304 VAN WINKLE CTRemove/Reinstall roof mounted PV solar system. PECWesley Davisactive
40solar2026-07-21AUSTIN3901 MC NEIL DRBASE: Installing a backup battery system.Martin Rodriguezfinaled
40solar2026-07-14AUSTIN7100 MESA DRBASE: Submitting repair application as per Hyatts on-site request. Part of Base battery program with Austin Energy.Martin Rodriguezfinaled
40solar2026-07-13AUSTIN400 GROVE BLVDInstallation of solar light poles around the existing playground area to increase security. 2026 015673 DA - ApprovedLeslie Perezactive
40solar2026-07-13AUSTIN604 ARBOR CIRInstall (N) 10 kWh ESS on (E) 2.61 kWDC PV System.John Careyactive
40solar2026-07-13AUSTIN2209 GALWAY STSOLAR ROOFTOPPaul Joycefinaled
40solar2026-07-10AUSTIN9600 AIRE LIBRE DRDisconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size. 5.22kW systemChadwyck Preeceactive
40solar2026-07-09AUSTIN5710 CARRY BACK LNInstalling 10.56 kW DC of solar (24 440 W modules 24 Enphase IQ8+ microinverters) on an existing residence. Line-side tap interconnection. No battery.Patrick Baxteractive
40solar2026-07-09AUSTIN3803 PETES PATH4.32Kw rooftop solar installJohn Harrellfinaled
40solar2026-07-08AUSTIN13649 RUTLEDGE SPUR BLDG 3QT PV - Rooftop Solar. Line side tap interconnection AT EXISTING MULTIFAMILY - OVA SMART HousingMark Prideactive
40solar2026-07-08AUSTIN13649 RUTLEDGE SPUR BLDG 2SMART housing. Rooftop Solar. Line side tap interconnection.Mark Prideactive
40solar2026-07-08AUSTIN13649 RUTLEDGE SPUR BLDG 1Rooftop Solar Line Side Tap InterconnectionMark Prideactive
40solar2026-07-08AUSTIN13649 RUTLEDGE SPUR BLDG 4QT PV - Rooftop Solar. Backfed breaker interconnection AT EXISTING MULTIFAMILY - OVA SMART HousingMark Prideactive
40solar2026-07-08AUSTIN8134 MESA DR UNIT BRooftop Solar Line side tap interconnection - Building BJeff Bendallfinaled
40solar2026-07-08AUSTIN13649 RUTLEDGE SPUR BLDG 2SMART housing. Rooftop Solar. Line side tap interconnection.Mark Prideactive
40solar2026-07-08AUSTIN13649 RUTLEDGE SPUR BLDG 1Rooftop Solar Line Side Tap InterconnectionMark Prideactive
40solar2026-07-08AUSTIN13649 RUTLEDGE SPUR BLDG 3QT PV - Rooftop Solar. Line side tap interconnection AT EXISTING MULTIFAMILY - OVA SMART HousingMark Prideactive
40solar2026-07-08AUSTIN9001 SCOTTISH PASTURES DRInstall 25.08 kW DC SolarMark Prideactive
40solar2026-07-07AUSTIN9215 S 1ST STInstalling 95.15kW solar system with 173 ALEX-550-W-144-S solar panels and 3 SCA25K for Existing Storage FacilityOrtiz Mosesactive
40solar2026-07-02AUSTIN13100 BROADMEADE AVEReed - 39-77634 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps.Mark Bedellfinaled
40solar2026-07-01AUSTIN7117 HOWERINGTON CIRInstalling a backup battery system and additional meter socket.Martin Rodriguezfinaled
40solar2026-06-30AUSTIN7513 TRAYLOR CVInstallation of 10.56kw Solar PV system.Michael Novakfinaled
40solar2026-06-29AUSTIN1517 BEN CRENSHAW WAYInstalling a 17.835 kW PV system (2) TESLA INC. 1707000-XX-Y inverters/batteries and (1) TESLA INC. 1807000-XX-Y battery.Michael Solanofinaled
40solar2026-06-29AUSTIN5307 COBALT CANOPY BNDInstall roof mounted solar - (14) 420W panels - 5.88 kW Added (1) Tesla Powerwall 3 BatteryDavid Juliusfinaled
40solar2026-06-29AUSTIN1000 E 41ST STInstall new 100.00 KWDC Rooftop solar system servicing existing commercial.Federico Lopezactive
40solar2026-06-29AUSTIN6101 CHICTORA CV15.8 KW solar systemDominic Nerifinaled
40solar2026-06-29AUSTIN1000 E 41ST STInstall new 100.00 KWDC Rooftop solar system servicing existing commercial. ***At this property the location of the PV meter is behind a locked metal grate door outside. Please call Michaela at (512-779-9466) or stop a worker on site and ask to have someone from Rogers Obrien to unlock the door.***Federico Lopezactive
40solar2026-06-26AUSTIN715 E 32ND ST BLDG AInstall of solar panelsDavid Wrightfinaled
40solar2026-06-22AUSTIN2526 KRAMER LN BLDG EInstall new 116.82 kWDC rooftop solar system to commercial only.Charles Kirkactive
40solar2026-06-22AUSTIN1141 CHICON ST BLDG 2QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection Aux EP needed. Remodel EP not needed. Existing multi family - OVAMark Pridefinaled
40solar2026-06-22AUSTIN8101 N LAMAR BLVD NBNEW PHOTOVOLTAIC SYSTEM 176.54KW (DC) 160.00 KW (AC) 364 PANELAdrian Buckfinaled
40solar2026-06-18AUSTIN1506 BRUSHY VIEW CVInstallation of: OFF-GRID PV + Battery System System Size: SOLAR PV: 7.2 kW-DC/11.4 kW-AC BATTERY: 15kWh Modules: 16 CW ENERGY: CWT450-108TNB10 - 450W Inverter(s): 1 FRANKLIN WH INVERTER BATTERY: APOWER S-10 APRS-10K15V1-US Other: 1 FRANKLIN WH MID: AGATE X 1 FRANKLIN WH INVERTER BATTERY: APOWER S-10 APRS-10K15V1-US 1 MAIN SERVICE PANEL: 125A 1 MLO PANEL: 125A 1 EV CHARGING RECEPTACLE: 120V NEMA 14-50 Notes: OFF-GRID System: NOT interconnecting with Austin Energy grid PV array inverter battery aGate main service panel & EV charger to be located on existing carport. TRENCH: APPROXIMATELY 65 ft - AT LEAST 18 DEPTH ABOVE CONDUIT PER NEC 300.5 MLO panel to be located inside workshopGreg Schmidtactive
40solar2026-06-17AUSTIN1601 MAGPIE CVTemporary Austin Energy disconnect/reconnect required for service equipment work. Replace existing meter can with new meter can and install 150A listed microgrid interconnection device / service-rated transfer equipment for battery energy storage backup system. Existing service size to remain 150 Amps. Austin Energy meter removal/reinstall and temporary shutdown to be coordinated with AE Distribution Metering.Eric Hoffmanfinaled
40solar2026-06-16AUSTIN9901 SALVIA CVDisconnect/reconnect to tie in PV/ESS components. We are not upgrading the size of the service not upgrading the meter size.Chadwyck Preeceactive
40solar2026-06-15AUSTIN2526 KRAMER LN BLDG EInstall new 116.82 kWDC rooftop solar system to commercial only.Charles Kirkactive
40solar2026-06-15AUSTIN1601 MAGPIE CVInstallation of 9.57 KE SOlar PV System to roof of residence with 27.12 KWH ESSEric Hoffmanfinaled
40solar2026-06-15AUSTIN5 EHRLICH RDInstallation of 9.57 KW Solar PV System to roof of residence with 36.16 KWH ESS.Eric Hoffmanfinaled
40solar2026-06-15AUSTIN2526 KRAMER LN BLDG EInstall new 116.82 kWDC rooftop solar system to commercial only. Meter is being billed under plain address building E on meter can address is not necessary MRT - DB Meter # associated with this project 6158208Charles Kirkactive
40solar2026-06-12AUSTIN1304 DAYTONA DRDisconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _150__ Main Breaker. Upgrading revenue meter to 200 Amps only.Mark Bedellactive
40solar2026-06-12AUSTIN2002 DELVIN LNRhoades - 39-74335 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 Main Breaker. Upgrading revenue meter to 200 Amps.Mark Bedellfinaled
40solar2026-06-11AUSTIN6200 LOST HORIZON DRHuckabee - 39-53028 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. REQUESTING WIRE PULL.Mark Bedellfinaled
40solar2026-06-10AUSTIN6652 RUXTON LNRankin/Weems - 39-73008 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker.Mark Bedellfinaled
40solar2026-06-10AUSTIN8227 N LAMAR BLVDInstalling 90.2 kW Solar System with 164 ALEX-550-W panels 1 SCA50KTL-DO and 1 SCA25KTL-DO Inverters.Ortiz Mosesactive
40solar2026-06-09AUSTIN13649 RUTLEDGE SPUR BLDG 4QT PV - Rooftop Solar. Backfed breaker interconnection AT EXISTING MULTIFAMILY - OVA SMART HousingJeff Bendallactive
40solar2026-06-09AUSTIN9516 HUNTER LNREQUEST TO DISCONNECT - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker. ** Customer says this is the main service panel to 200 amps but we are not touching the meter no meter work being performed.Mark Bedellfinaled
40solar2026-06-09AUSTIN13649 RUTLEDGE SPUR BLDG 3QT PV - Rooftop Solar. Line side tap interconnection AT EXISTING MULTIFAMILY - OVA SMART HousingJeff Bendallactive
40solar2026-06-08AUSTIN1025 TRACI MICHELLE DRROOFTOP SOLAR WITH BACKUP BATTERY - THIS IS A REPAIR PERMIT BECAUSE IT IS AN ONCOR PROJECT. AUX PERMIT IS FOR AE CUSTOMERS ONLYPaul Joyceactive
40solar2026-06-08AUSTIN6317 FM 2244 RD38.88KW Rooftop PV InstallationDelaney Ryanactive
40solar2026-06-08AUSTIN1517 BEN CRENSHAW WAYETJ - Installing a 17.835 kW PV system (2) TESLA INC. 1707000-XX-Y inverters/batteries and (1) TESLA INC. 1807000-XX-Y battery (Per call from customer does req a disconnect)Michael Solanofinaled
40solar2026-06-05AUSTIN1103 CARLOTTA LNRequest to disconnect 200A main breaker to install new 200A transfer switch for energy storage installation. No meter can replacment required.David Wrightfinaled
40solar2026-06-04AUSTIN2400 S CONGRESS AVECommercial rooftop Solar installation 770.18 kw DC.Eric Kayactive
40solar2026-06-04AUSTIN9215 S 1ST STInstalling 95.15kW solar system with 173 ALEX-550-W-144-S solar panels and 3 SCA25K for Existing Storage FacilityOrtiz Mosesactive
40solar2026-06-03AUSTIN7100 TOWERING OAKS DRChavis-Parod - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker. Upgrading revenue meter to 200 Amps only. Requesting underground wire pull.Mark Bedellfinaled
40solar2026-06-03AUSTIN9215 S 1ST STInstalling 95.15kW solar system with 173 ALEX-550-W-144-S solar panels and 3 SCA25K for Existing Storage FacilityJames Hiebertactive
40solar2026-06-01AUSTIN6416 BRIDGEWATER DRGivens - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker. Upgrading revenue meter to 200 Amps only. Requesting underground wire pull.Mark Bedellfinaled
40solar2026-06-01AUSTIN12506 N LAMAR BLVDIn 137.5 KW Solar System with 250 ALEX-550-W panels and 2 SCA60KTL-DO invertersOrtiz Mosesfinaled
40solar2026-06-01AUSTIN12506 N LAMAR BLVDIn 137.5 KW Solar System with 250 ALEX-550-W panels and 2 SCA60KTL-DO invertersOrtiz Mosesfinaled
100 rows shown