Permits
2,678 permits • page 10 of 27
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 45 | roofing | 2026-06-23 | AUSTIN | 2209 S 3RD ST | Express; Metal roof replacement | $1 | Ace Fierro | active |
| 45 | roofing | 2026-06-22 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 16 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 209 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT HVAC | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 110 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 109 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 108 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 210 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 208 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-10 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 15 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-01 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 14 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-28 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 13 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 11 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 12 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-30 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 10 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-21 | AUSTIN | 3215 CUPID DR | Express: Roof replacement with re-deck of plywood underneath the shingles with 7/16 OSB | $1 | Ben Keiderling | finaled |
| 45 | roofing | 2026-04-15 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 9 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-03 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 8 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-03-26 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 7 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-03-25 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Monty Lamb | active | |
| 45 | roofing | 2026-03-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 6 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-25 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 5 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-19 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Colton Conklin | active | |
| 45 | roofing | 2026-02-19 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | George Picken | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Tu Huynh | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Scott Schenk | active | |
| 45 | roofing | 2026-01-06 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Tad Perkin | active | |
| 45 | roofing | 2025-12-31 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | $1 | Tres Davis | active |
| 45 | roofing | 2025-12-31 | AUSTIN | 5614 BULL CREEK RD | Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | $1 | Tres Davis | active |
| 45 | roofing | 2025-12-02 | AUSTIN | 701 CONGRESS AVE | Roof replacement - TPO | David Bernal | active | |
| 45 | roofing | 2025-11-20 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 4 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2025-11-06 | AUSTIN | 2406 BROKEN OAK DR | Express: Re-roof 2800 SqFt decking removal and replacement | $1 | Tyler Beal | active |
| 45 | roofing | 2025-09-15 | AUSTIN | 7601 BURNET RD | Roof Replacement for St. Louis Catholic Church | Steven Sartory | active | |
| 45 | roofing | 2025-08-28 | AUSTIN | 4330 BULL CREEK RD | Asphalt shingle roof replacement | Chris Macias | finaled | |
| 45 | roofing | 2025-08-27 | AUSTIN | 5010 OLD MANOR RD | Roof Replacement for City Office Building | Holly Zihlman | finaled | |
| 45 | roofing | 2025-08-18 | AUSTIN | 5440 BURNET RD | Non-structural re-roof like-for-like replacement only. | Cameron Smith | finaled | |
| 45 | roofing | 2025-07-24 | AUSTIN | 727 AIRPORT BLVD | Roof Replacement: Flute Fill and TPO Membrane over Existing Office/Warehouse | Michael Kastel | finaled | |
| 45 | roofing | 2025-07-24 | AUSTIN | 729 AIRPORT BLVD | Roof Replacement: Flute Fill and TPO Membrane over Existing Office/Warehouse | Michael Kastel | finaled | |
| 45 | roofing | 2025-07-14 | AUSTIN | 3613 BLUESTEIN DR | TPO Roof Replacement | David Bernal | finaled | |
| 45 | roofing | 2025-06-18 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Jesse Beckett | finaled | |
| 45 | roofing | 2025-06-18 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Erik Christiansen | finaled | |
| 45 | roofing | 2025-06-17 | AUSTIN | 600 CONGRESS AVE UNIT 3000 | REMODEL OF AN EXTERIOR ROOF DECK ON THE 30TH FLOOR - SCOPE INCLUDES REPLACEMENT OF EXTERIOR DOORS AND WINDOWS AND ROOFING STRUCTURAL REINFORCEMENT AND | Matt Dausch | active | |
| 45 | roofing | 2025-06-12 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | NATHAN DOELITSCH | finaled | |
| 45 | roofing | 2025-06-09 | AUSTIN | 6106 ROSS RD BLDG 2 | Bldg 2 - Repair broken gas line on roof due to storm damage | David L Kinney | finaled | |
| 45 | roofing | 2025-06-09 | AUSTIN | 6106 ROSS RD BLDG 1 | Bldg 1 - Repair broken gas line on roof due to storm damage | David L Kinney | finaled | |
| 45 | roofing | 2025-06-04 | AUSTIN | 1702 GILES ST | Emergency Permit from Storm Damage. Tree has fallen on power line and Austin Energy has cut power. ***Storm Related-Emergency inspection done on 6/3/ | William John Morris III | finaled | |
| 45 | roofing | 2025-06-02 | AUSTIN | 1428 WEBBERVILLE RD | Emergency (Storm Damage) - Service Replacement ***Storm Related-Emergency inspection done on 5/30/35. ESPA is required.-Hyatt*** | Benjamin Hubbard | finaled | |
| 45 | roofing | 2025-05-30 | AUSTIN | 1149 WEBBERVILLE RD | Emergency due to thunderstorm Emergency permit to replace riser only due to damaged by fallen tree. ***Emergency Inspection-Storm Damage-done on 5/29 | John Coppin | finaled | |
| 45 | roofing | 2025-05-29 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | Jerome Bell | finaled | |
| 45 | roofing | 2025-04-01 | AUSTIN | 8200 CAMERON RD BLDG B | Roof replacement | Holly Zihlman | finaled | |
| 45 | roofing | 2025-04-01 | AUSTIN | 8200 CAMERON RD BLDG A | Roof replacement | Holly Zihlman | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 10 | Roof Replacement for Building 10 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 12 | Roof Replacement for Building 12 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 1 | Roof Replacement for Building 1 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 9 | Roof Replacement for Building 9 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 11 | Roof Replacement for Building 11 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 13 | Roof Replacement for Building 13 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 8 | Roof Replacement for Building 8 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-03-20 | AUSTIN | 7707 S IH 35 SVRD NB BLDG 2 | Roof Replacement for Building 2 | Patrick Daiello | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG E | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building E | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG C | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building C | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG K | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building K | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG A | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building A | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-27 | AUSTIN | 9601 MIDDLE FISKVILLE RD BLDG H | Roof Replacement: Simple Shingle to Shingle Reroof without changing structure or decking for Building H | Courtney Dannelley | finaled | |
| 45 | roofing | 2025-02-03 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | Jacob Hussa | finaled | |
| 45 | roofing | 2025-01-23 | AUSTIN | 1701 W 32ND ST | Interior Remodel Fire damage (general demo of framing to roof and exterior wall at right and rear elevation replacement of windows doors insulation d | $1 | Jacob Hussa | finaled |
| 45 | roofing | 2024-11-11 | AUSTIN | 6710 BURNET RD | Change of use from vehicle sales to vehicle rental. New CO no construction or change to the building profile. Potential roof replacement from hail dam | Cody Sprinkle | finaled | |
| 45 | roofing | 2024-10-18 | AUSTIN | 2219 MANOR RD | Mechanically attach new .60 mil. TPO over existing hail damage modified. No structural changes. | Daniel McCoy | finaled | |
| 45 | roofing | 2024-09-30 | AUSTIN | 607 RED RIVER ST | Roof Replacement | Molly Johnston | finaled | |
| 45 | roofing | 2024-09-12 | AUSTIN | 8733 BURNET RD | Roof Replacement to existing Retail Building | Molly Johnston | finaled | |
| 45 | roofing | 2024-08-13 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Paone | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | Keating Kuhn | finaled | |
| 45 | roofing | 2024-07-03 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | David Demoss | finaled | |
| 45 | roofing | 2024-06-17 | AUSTIN | 3106 FRENCH PL | Express: Like for like reconstruction. Interior repairs consist of insulation drywall paint baseboard replacement. Exterior repairs consist of roof sh | $1 | Cameron Treme | finaled |
| 45 | roofing | 2024-06-11 | AUSTIN | 3811 AIRPORT BLVD | Replacement of TPO roof system. New system to meet IECC minimum requirements of R-25. | Steven Sartory | finaled | |
| 45 | roofing | 2024-05-28 | AUSTIN | 6205 BURNET RD | Replace existing TPO membrane from hail damage april 9 2024. Remove existing .60 mil. TPO and replace with new .60 mil. TPO using TPO bonding adhesive | Daniel McCoy | finaled | |
| 40 | roofing | 2026-07-07 | AUSTIN | 5811 TECHNI CENTER DR UNIT 200 | Install of new structural steel members Replace broken tilt wall panels Repair TPO Roof. | Joshua Turner | active | |
| 40 | roofing | 2026-07-03 | AUSTIN | 3404 WINDSOR RD | Interior remodel Remodel of upper level beds vault existing ceiling to underside of roof structure remodel of baths and adding 3rd plumbing work (full scope attached) | Sam E Eskew | active | |
| 40 | roofing | 2026-07-01 | AUSTIN | 3207 NORTHEAST DR | Express: Re-roofing (located in WUI) | $1 | Chris Haywood | active |
| 40 | roofing | 2026-07-01 | AUSTIN | 5811 TECHNI CENTER DR UNIT 200 | Install of new structural steel members Replace broken tilt wall panels Repair TPO Roof. | Kyle Hogg | active | |
| 40 | roofing | 2026-06-30 | AUSTIN | 611 S CONGRESS AVE | Demo roof mechanical existing condensing unit and associated refrigerant piping. Prepare roof penetrations for new piping. Install new curbed outside air intake and install condensing unit. install new exhaust fan Existing office building. | Mark McDonald | active | |
| 40 | roofing | 2026-06-30 | AUSTIN | 6306 CRAIGWOOD CIR | Express- Remove and replace roof with similar type material | $1 | Jessica Plata | active |
| 40 | roofing | 2026-06-30 | AUSTIN | 10508 MC MILLIAN DR | Express: Replace existing roof with metal roof and repair or replace any damaged eaves or facings | $1 | Kern Thwing | active |
| 40 | roofing | 2026-06-30 | AUSTIN | 1210 SAN ANTONIO ST | Reroof - Reinstall the pavers and pedestals using a slip sheet of HP Protective Mat or a sacrificial layer of TPO membrane. | Molly Johnston | active | |
| 40 | roofing | 2026-06-30 | AUSTIN | 1405 WHEATFALL LN | Express: Re-roofing (Located in WUI) | $1 | Nicole Christofilis | finaled |
| 40 | roofing | 2026-06-30 | AUSTIN | 4001 CAMPO VIEJO CV | New 1-story detached accessory structure (pool side cabana) 1 bath with stone veneer flat TPO roof wood frame on drilled concrete caissons. Cabana includes bathroom (shower + WC). Reconnect to existing underground electrical conduit previously servicing pergola. Install new 60 amp subpanel in cabana. One dedicated circuit for 1-ton ductless mini-split (230v) | $0 | Juan Gonzalez | active |
| 40 | roofing | 2026-06-29 | AUSTIN | 3015 INDUSTRIAL TER | TPO overlay over existing metal r-panel roof to include new metal trim gutters and downspouts. Existing auto parts store. | Barry Temnick | active | |
| 40 | roofing | 2026-06-29 | AUSTIN | 6008 LADY MILDRED WAY | Installation of roof mounted solar system 6.2kW | Logan Stone | finaled | |
| 40 | roofing | 2026-06-29 | AUSTIN | 9204 UNITED DR | Install TPO roofing system over existing metal R-panel roof. No structural modifications. No changes to occupancy use footprint building height or drainage. | Barry Temnick | active | |
| 40 | roofing | 2026-06-29 | AUSTIN | 1712 E 11TH ST | Removal of Existing Roofing System on the Entire School with a new PVC Roofing System. / Removal and disposal of existing mechanical roofing support members. Also work includes replacing of 8 existing skylights/ installed of through wall overflow rains AISD Project | Juan Garcia | finaled | |
| 40 | roofing | 2026-06-28 | AUSTIN | 2306 WILLOW ST | My Client needs the 2 riggid conduit Riser extended higher up 24 the service entrance wires inside the riser need to be extended 24 do to a new slope of the roof addition. Existing 200 amp service remains the same only the service wires and conduit need to extend higher. Contractor needs a disconnect/reconnect | Jose Lucio | finaled | |
| 40 | roofing | 2026-06-25 | AUSTIN | 2419 RIO GRANDE ST | Reroof TPO | Harold Peterson | finaled | |
| 40 | roofing | 2026-06-25 | AUSTIN | 7813 NORTHWEST DR | Replace roof shingles with new shingles and replace fascia and any bad decking as needed. | $1 | Charles Bertero | finaled |
| 40 | roofing | 2026-06-23 | AUSTIN | 13209 HYMEADOW CIR | Detach and Reset of Existing Solar System for Re-Roof. | Lucas Starbuck | active | |
| 40 | roofing | 2026-06-23 | AUSTIN | 10701 LAMBERT CIR | Express: Re-roofing - material change (asphalt shingles to metal) | $1 | Stacie Feller | finaled |
| 40 | roofing | 2026-06-23 | AUSTIN | 13377 POND SPRINGS RD | Remove existing roof down to deck install 4.4 inch of new insulation and .60 Mil TPO | Robert Ward | finaled | |
| 40 | roofing | 2026-06-23 | AUSTIN | 10600 LONDONSHIRE LN | Express: WUI zone c reroofing with Class A fire roofing material- owens corning duration shingles and OC underlayment mesh in ventilation | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-06-23 | AUSTIN | 7806 LAKEWOOD DR | Express: Re-roofing (located in WUI) | $1 | Fareed Tulbah | finaled |
| 40 | roofing | 2026-06-22 | AUSTIN | 2700 MOUNTAIN LAUREL LN | Express: reroof | $1 | Frank Rendon | active |
| 40 | roofing | 2026-06-22 | AUSTIN | 6028 SIGNAL PT | Express: Re-roofing (located in WUI) | $1 | Antonio Gonzalez | active |