2,814 permits • page 10 of 29
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 50 | roofing | 2024-08-20 | AUSTIN | 408 BLUEBERRY HILL | Express: Fire Loss General demo framing repairs roof replacement plumbing electrical HVAC siding drywall insulation cabinets finish carpentry repairs. | Mario Vazquez | finaled | |
| 50 | roofing | 2024-08-15 | AUSTIN | 408 BLUEBERRY HILL | Express: Fire Loss General demo framing repairs roof replacement plumbing electrical HVAC siding drywall insulation cabinets finish carpentry repairs. | $1 | Jacob Hussa | finaled |
| 50 | roofing | 2024-08-13 | AUSTIN | 4808 RUSSET HILL DR | Express: Change windows siding roof and a tub to shower conversion. Revision-electrical panel upgrade and water heater replacement | Dylan James Byrd | finaled | |
| 50 | roofing | 2024-08-12 | AUSTIN | 4521 WEST GATE BLVD | Overlay new PVC .60 mil membrane over existing due to hail damage | Daniel McCoy | finaled | |
| 50 | roofing | 2024-08-07 | AUSTIN | 4808 RUSSET HILL DR | Express: Change windows siding roof and a tub to shower conversion. Revision-electrical panel upgrade and water heater replacement | Justin Rubio | finaled | |
| 50 | roofing | 2024-08-05 | AUSTIN | 6603 BOURG CV | Express: tub-to-shower replacement window replacement (like for like) roof replacement HVAC replacement sheetrock repair | Salomon Garcia | finaled | |
| 50 | roofing | 2024-08-04 | AUSTIN | 6603 BOURG CV | Express: tub-to-shower replacement window replacement (like for like) roof replacement HVAC replacement sheetrock repair | $1 | Hector Perez Millan | finaled |
| 50 | roofing | 2024-08-02 | AUSTIN | 1912 W 40TH ST | *partial demo* interior remodel: remodel of existing kitchen and bathroom asphalt shingle roof replacement repair of roof damage from Feb/2021 storm R | $1 | Marc Nightwine | finaled |
| 50 | roofing | 2024-08-02 | AUSTIN | 3818 FAR WEST BLVD UNIT 102 | Roof Replacement TPO for Units 102-111 | Harold Peterson | finaled | |
| 50 | roofing | 2024-08-02 | AUSTIN | 500 MAIRO ST | Partial renovation of existing elementary school to include replacement roof | ELIGIO BLANCO | finaled | |
| 50 | roofing | 2024-07-29 | AUSTIN | 500 MAIRO ST | Partial renovation of existing elementary school to include replacement roof | Kwangsub Kim | finaled | |
| 50 | roofing | 2024-07-23 | AUSTIN | 500 MAIRO ST | Partial renovation of existing elementary school to include replacement roof | Jesse Beckett | finaled | |
| 50 | roofing | 2024-07-11 | AUSTIN | 810 W HOWARD LN | Roof Replacement | Holly Zihlman | finaled | |
| 50 | roofing | 2024-07-10 | AUSTIN | 6101 PATTON RANCH RD | Partial renovation of existing Elementary School to include replacement of roof. | Kenneth Tumlinson | finaled | |
| 50 | roofing | 2024-07-09 | AUSTIN | 1310 CLOVERLEAF DR | PANEL SWAP EMERGENCY STORM DAMAGE ADD CAN LIGHTS 12 | Juan Garcia | finaled | |
| 50 | roofing | 2024-06-26 | AUSTIN | 11909 HURRICANE HAZE DR | Installation of solar panels on existing residential roof. 4.62 kW. | David Conrad | finaled | |
| 50 | roofing | 2024-06-26 | AUSTIN | 5415 TIPTON DR | Express: roof/window/siding replacement (like for like) foundation repair interior wall reinsulation tub/shower/surround remodel HVAC/plumbing equipme | Jerry L Roudebush | finaled | |
| 50 | roofing | 2024-06-20 | AUSTIN | 4802 WEST GATE BLVD | Repair fire damage to the roof and wires of a 4-plex residence This includes units 101 102 103 and 104 DB - MRT | Joe D Woods | finaled | |
| 50 | roofing | 2024-06-17 | AUSTIN | 5415 TIPTON DR | Express: roof/window/siding replacement (like for like) foundation repair interior wall reinsulation tub/shower/surround remodel HVAC/plumbing equipme | Gabriel Nieves | finaled | |
| 50 | roofing | 2024-06-13 | AUSTIN | 12120 JOHNNY WEISMULLER LN UNIT 2 | express one drywall patch & roof replacement of shingles & rotted decking | $1 | Maria L Aleman | finaled |
| 50 | roofing | 2024-06-13 | AUSTIN | 9600 S IH 35 SVRD SB BLDG L | Nonstructural reroof to existing Retail Bldg. *MUST COMPLY W/CURRENT COA ENERGY CODES* | active | ||
| 50 | roofing | 2024-06-11 | AUSTIN | 4808 RUSSET HILL DR | Express: Change windows siding roof and a tub to shower conversion. Revision-electrical panel upgrade and water heater replacement | $1 | Carlos Diaz | finaled |
| 50 | roofing | 2024-06-10 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Blower C Bldg. | Holly Zihlman | finaled | |
| 50 | roofing | 2024-06-10 | AUSTIN | 500 MAIRO ST | Partial renovation of existing elementary school to include replacement roof | Seth Adams | finaled | |
| 50 | roofing | 2024-06-07 | AUSTIN | 6203 SHADOW VALLEY DR UNIT 1 | Emergency Service Rebuild due to storm damage. Service will be rebuilt with new equipment to code. | Randall Mallory | finaled | |
| 50 | roofing | 2024-06-06 | AUSTIN | 4705 AVENUE F | Storm damage to riser meter hub . Replaced riser and hub no damage to actual meter no meter can required | Curtis Sellers | finaled | |
| 50 | roofing | 2024-06-06 | AUSTIN | 5604 SUNDAY SILENCE DR | Express: Replace walk in shower Replace HVAC unit. **Full HVAC replacement New Roof New rear sliding glass door New weather stripping on all exterior | $1 | Luis Nunez | finaled |
| 50 | roofing | 2024-05-31 | AUSTIN | 2600 LONGHORN BLVD | Roof Replacement | Holly Zihlman | finaled | |
| 50 | roofing | 2024-05-28 | AUSTIN | 8620 BURNET RD UNIT 100 | Re-roof- Remove existing single ply membrane only leaving insulation in place. Mechanically attach separator coverboard. Mechanically attach white TPO | finaled | ||
| 50 | roofing | 2024-05-24 | AUSTIN | 8301 FURNESS DR | Demolition of existing roof mounted heat recovery units (HRUs) and installations of new HRUs. Demo of select ground source heat pumps and replacement | Edgar Kleck | finaled | |
| 50 | roofing | 2024-05-23 | AUSTIN | 809 RIO GRANDE ST | Single-layer roof replacement 22 sq total of asphalt dimensional shingles and 6 squares of modified bitumen roofing. No roof or attic penetrations. | Nathan Navarro | finaled | |
| 50 | roofing | 2024-05-21 | AUSTIN | 1404 PARK CENTER DR | This is a CRAC and Roof top unit replacement project. The scope of work includes limited mechanical and electrical work per plans. ***NEED TO PULL LI | Weslee Jones | finaled | |
| 50 | roofing | 2024-05-21 | AUSTIN | 1404 PARK CENTER DR | This is a CRAC and Roof top unit replacement project. The scope of work includes limited mechanical and electrical work per plans. ***NEED TO PULL LI | Edward Neal Jr | finaled | |
| 50 | roofing | 2024-05-21 | AUSTIN | 808 HOLLYBLUFF ST | EMERGENCY - storm damage; rebuild and replace 125A overhead service and riser | Charles D Gordon | finaled | |
| 50 | roofing | 2024-05-21 | AUSTIN | 806 HOLLYBLUFF ST | EMERGENCY - storm damage; rebuild and replace 125A overhead service and riser | Charles D Gordon | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Preliminary Treatment A | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Preliminary Treatment B | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Sludge Transfer Facility | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement - SAR Roof Replacements - Secondary Sludge Pump Train A | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Flow Equalization Bldg. A | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1924 E 38TH HALF ST | Roof Repair/ Membrane Replacement Remove Existing TPO Membrane and Install New. Replace comping and gutters no change to Structure | Will Atterberry | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 404 S LAMAR BLVD SB | Replacement of MAU on roof | Daniel Manrique-Greenwood | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement for Utility Pump Building | David Bernal | finaled | |
| 50 | roofing | 2024-05-20 | AUSTIN | 1017 FALLWELL LN | Roof Replacement - SAR Roof Replacements - Flow Equalization Bld. B | David Bernal | finaled | |
| 50 | roofing | 2024-05-17 | AUSTIN | 5415 TIPTON DR | Express: roof/window/siding replacement (like for like) foundation repair interior wall reinsulation tub/shower/surround remodel HVAC/plumbing equipme | $1 | Gabriel Dunlap | finaled |
| 50 | roofing | 2024-05-17 | AUSTIN | 3001 BOXDALE DR | EMERGENCY REPAIR on riser and meter from storm damage | Averil White | finaled | |
| 50 | roofing | 2024-05-15 | AUSTIN | 5604 SUNDAY SILENCE DR | Express: Replace walk in shower Replace HVAC unit. **Full HVAC replacement New water heater New Roof New rear sliding glass door New weather stripping | Salomon Garcia | finaled | |
| 50 | roofing | 2024-05-14 | AUSTIN | 5808 ADAIR DR | express fire damage repair roof dormer truss & drywall | Alfonso Martinez | finaled | |
| 50 | roofing | 2024-05-13 | AUSTIN | 8108 BRIARWOOD LN | Storm damage*** rebuild main electrical service panel due to storm damage | Brian Robert West | finaled | |
| 50 | roofing | 2024-05-13 | AUSTIN | 5808 ADAIR DR | express fire damage repair roof dormer truss & drywall | Kris Koester | finaled | |
| 50 | roofing | 2024-05-13 | AUSTIN | 11911 ARBOR DOWNS RD | Express: roof decking repair shingle replacement (exempt) | $1 | Dylan Trotsek | finaled |
| 50 | roofing | 2024-05-07 | AUSTIN | 6101 PATTON RANCH RD | Partial renovation of existing Elementary School to include replacement of roof. | Alexis Stecker | finaled | |
| 50 | roofing | 2024-05-07 | AUSTIN | 8200 CROSS PARK DR | Roof Replacement. | David Bernal | finaled | |
| 50 | roofing | 2024-05-07 | AUSTIN | 1100 SUMMIT ST | express existing uncovered wood deck due to fire damage Eric Thomas approved for this to be processed as express fire damage Revision: Re-roof stru | Austin Johnson | active | |
| 50 | roofing | 2024-05-06 | AUSTIN | 4404 ADELPHI LN | REPAIR OF SOLAR SYSTEM DUE TO HAIL DAMAGE | Albert Garza | finaled | |
| 50 | roofing | 2024-05-06 | AUSTIN | 508 GATE TREE LN | Repair only permit pulled asap; Mast replacement storm damage. ***EMERGENCY INSPECTION DONE ON 4/29/24-HYATT*** | Brian Robert West | finaled | |
| 50 | roofing | 2024-05-06 | AUSTIN | 5317 HARVEST LN | Storm damage Replaced riser and meter socket damaged from storm. Inspected and re connected on 4/29 ***EMERGENCY INSPECTION DONE ON 4/29/24-HYATT*** | Brian Robert West | finaled | |
| 45 | roofing | 2026-09-01 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) | Matthew C Dunn | active | |
| 45 | roofing | 2026-09-01 | AUSTIN | 1605 W 11TH ST | Express: Replace siding insulation drywall doors and windows; new electrical new A/C drain line re-roof | Khanh Pham | active | |
| 45 | roofing | 2026-09-01 | AUSTIN | 307 FRANKLIN BLVD | REQUEST TO DISCONNECT Newton 39-92630. Disconnect/reconnect power to tie in PV component. Upgrading MSP to 200 Amps. 200 - Main Breaker. Upgrading revenue meter to 200 Amps. Extending overhead mast/weather head to over 8ft above roof plane only. | Mark Bedell | active | |
| 45 | roofing | 2026-09-01 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) | Jacob Elrod | active | |
| 45 | roofing | 2026-08-27 | AUSTIN | 13212 N LAMAR BLVD | Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym | Thomas Montanez | active | |
| 45 | roofing | 2026-08-19 | AUSTIN | 1501 HUCKLEBERRY LN | Express: Wui zone C reroofing with Class a Fire Roofing Material- Owens Coming Duration shingles and OC underlayment mesh in ventilation. | $1 | Fareed Tulbah | finaled |
| 45 | roofing | 2026-08-17 | AUSTIN | 2706 WHELESS LN UNIT 104 | Remodel Unit all new mechanicals such as electrical plumbing hvac insulation drywall exterior siding roofing portion chimney exterior brick door- due to Fire Damage to Unit 104 | Adan Miranda | active | |
| 45 | roofing | 2026-07-14 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 18 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-25 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 17 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-24 | AUSTIN | 1200 E RUNDBERG LN | Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2 | Vincent Gillette | active | |
| 45 | roofing | 2026-06-23 | AUSTIN | 2209 S 3RD ST | Express; Metal roof replacement | $1 | Ace Fierro | finaled |
| 45 | roofing | 2026-06-22 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 16 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 209 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT HVAC | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 110 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 109 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 108 | Renovation to include like-for-like HVAC replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. Repair in the boiler room from water damage. (Building C Floor 1) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 210 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-17 | AUSTIN | 1208 E 52ND ST UNIT 208 | 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C) | Carlos Lopez | active | |
| 45 | roofing | 2026-06-10 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 15 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-06-01 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 14 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-28 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 13 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 11 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-05-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 12 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-30 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 10 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-21 | AUSTIN | 3215 CUPID DR | Express: Roof replacement with re-deck of plywood underneath the shingles with 7/16 OSB | $1 | Ben Keiderling | finaled |
| 45 | roofing | 2026-04-15 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 9 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-04-03 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 8 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-03-26 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 7 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-03-25 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Monty Lamb | active | |
| 45 | roofing | 2026-03-18 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 6 | Shingle Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-25 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 5 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2026-02-19 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Colton Conklin | active | |
| 45 | roofing | 2026-02-19 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | George Picken | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Tu Huynh | active | |
| 45 | roofing | 2026-02-18 | AUSTIN | 905 CONGRESS AVE | Restoration of interior finishes and millwork due to fire/water damage. Include replacement of damaged roofing skylights and rooftop equipment. | Scott Schenk | active | |
| 45 | roofing | 2026-01-06 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | Tad Perkin | active | |
| 45 | roofing | 2025-12-31 | AUSTIN | 5614 BULL CREEK RD | EXPRESS: Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | $1 | Tres Davis | active |
| 45 | roofing | 2025-12-31 | AUSTIN | 5614 BULL CREEK RD | Repairs to fire damage. Partial roof framing and interior finish out drywall/cabinets/floors. | $1 | Tres Davis | active |
| 45 | roofing | 2025-12-02 | AUSTIN | 701 CONGRESS AVE | Roof replacement - TPO | David Bernal | active | |
| 45 | roofing | 2025-11-20 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 4 | TPO Roof Replacement | Brad Davis | finaled | |
| 45 | roofing | 2025-11-06 | AUSTIN | 2406 BROKEN OAK DR | Express: Re-roof 2800 SqFt decking removal and replacement | $1 | Tyler Beal | active |
| 45 | roofing | 2025-09-15 | AUSTIN | 7601 BURNET RD | Roof Replacement for St. Louis Catholic Church | Steven Sartory | active |