Permits
2,678 permits • page 1 of 27
| Score | Trade | Date | City | Address | Description | Value | Contractor | Status |
|---|---|---|---|---|---|---|---|---|
| 90 | roofing | 2026-07-12 | AUSTIN | 5703 DUVAL ST | *Addressing active code violation* Addition/ remodel of existing 1-story single-family residential to include: carport was converted to garage w/o a permit; converting garage to (space not currently labeled) with addition of window seat utility room and half bath; addition to rear of property to include hallway 2 bedrooms and 1 bath; new rear uncovered wood deck; new covered front porch. Rolling in scope of work from expired 2025-078980 BP & PP: Express: Existing vinyl siding replacement existing wood frame single pane window replacement QTY x 6 existing roof shingle replacement (like for like) | Eulalio Torres | active | |
| 90 | roofing | 2026-04-20 | AUSTIN | 738 GUNTER ST | All Interior remodel with New Roof. No addition to the footprint or increase in house square footage. However a new roof will be added due to tree damage and itll increase the height of the structure from 14-4.5 to 15-8. | $190,000 | Daniel Besa | active |
| 90 | roofing | 2026-03-09 | AUSTIN | 5703 DUVAL ST | *Addressing active code violation* Addition/ remodel of existing 1-story single-family residential to include: carport was converted to garage w/o a permit; converting garage to (space not currently labeled) with addition of window seat utility room and half bath; addition to rear of property to include hallway 2 bedrooms and 1 bath; new rear uncovered wood deck; new covered front porch. Rolling in scope of work from expired 2025-078980 BP & PP: Express: Existing vinyl siding replacement existing wood frame single pane window replacement QTY x 6 existing roof shingle replacement (like for like) | $367,816 | Ryan Bollom | active |
| 80 | roofing | 2026-07-30 | AUSTIN | 8933 IVEANS CV | Addition/ remodel of 1 story SFR Construct a 455 SF addition and minor interior remodel including new foundation framing roofing drywall flooring cabinetry new electrical fixtures and wiring and new plumbing fixtures. No major demolition. | $1 | Taylor Ramsey | active |
| 80 | roofing | 2026-07-29 | AUSTIN | 3921 BALCONES DR | EXPRESS: We are replacing a garage door that is rotting with a new one. replacing 3 windows in the master bathroom with new ones that are the exact same size and brand. replacing some of the facia shingle mold and soffit around the house as needed due to rot repairing or replacing siding as needed and according to inspection report around the house due to rot. repairing some roof decking above the soffits installing a new composition roof and replacing the old one. replacing 3 air conditioning systems that were at their useful lifespans with high efficiency units replace can bulbs to LED bulbs installing a new tub in the master bath along with a new faucet in same location installing new tile flooring in the master bath installing new countertops/sinks/faucets in the master bath same locations installing a new toilet in master bath same location and repaint the entire house | Paul A Moebus | active | |
| 80 | roofing | 2026-07-28 | AUSTIN | 3921 BALCONES DR | EXPRESS: We are replacing a garage door that is rotting with a new one. replacing 3 windows in the master bathroom with new ones that are the exact same size and brand. replacing some of the facia shingle mold and soffit around the house as needed due to rot repairing or replacing siding as needed and according to inspection report around the house due to rot. repairing some roof decking above the soffits installing a new composition roof and replacing the old one. replacing 3 air conditioning systems that were at their useful lifespans with high efficiency units replace can bulbs to LED bulbs installing a new tub in the master bath along with a new faucet in same location installing new tile flooring in the master bath installing new countertops/sinks/faucets in the master bath same locations installing a new toilet in master bath same location and repaint the entire house | $1 | Sam Stewart | active |
| 80 | roofing | 2026-07-17 | AUSTIN | 3831 STECK AVE | 1-story addition to existing townhome. Existing Atrium will be converted to a studio. Level existing concrete and erect (1) wall. Add roof to match. (1) existing sliding door will be repurposed as window. Roll in expired permit 2014-066731 MP HVAC change out to exist res. | $1 | Manuel De Lara | active |
| 80 | roofing | 2026-05-22 | AUSTIN | 4205 RAMSEY AVE | Renovate existing 1-story ADU: Replace windows doors siding & roofing. Update MEP. Reconfigure floor plan/plumbing locations. Replace foundation in | Pedro Delgado | active | |
| 80 | roofing | 2026-04-30 | AUSTIN | 2306 WILLOW ST | Addition to existing 1-story single-family residential to include: new covered rear patio; leveling out roof. | Martin Medina | active | |
| 80 | roofing | 2026-04-22 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 S | $1,500,000 | active | |
| 80 | roofing | 2026-04-22 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) | $1,500,000 | active | |
| 80 | roofing | 2026-04-20 | AUSTIN | 738 GUNTER ST | All Interior remodel with New Roof. No addition to the footprint or increase in house square footage. However a new roof will be added due to tree da | $190,000 | Daniel Besa | active |
| 80 | roofing | 2024-08-28 | AUSTIN | 1211 SAN BERNARD ST | **Partial demolition to east wall and partial of roof structure to accomodate new addition of 2-bedrooms 1-car garage and 1-car carport addition to ex | $214,000 | active | |
| 75 | roofing | 2026-08-03 | AUSTIN | 3801 RED RIVER ST | Bathroom addition to existing 1-story single family residence. New bath includes 2 sinks 1 wc 1 shower new windows new framing new siding new foundation and roof. 3 bed/2 bath | $1 | David Mireles | active |
| 75 | roofing | 2026-07-30 | AUSTIN | 4800 CONVICT HILL RD | Roof replacement and renovations to existing sanctuary to accommodate installation of new HVAC equipment. | Michael Ambrose | active | |
| 75 | roofing | 2026-07-30 | AUSTIN | 4800 CONVICT HILL RD | Roof replacement and renovations to existing sanctuary to accommodate installation of new HVAC equipment. | John Haralson | active | |
| 75 | roofing | 2026-07-30 | AUSTIN | 12533 LABRADOR CV | Detach and reset for an already installed solar system due to hail damage and roof replacement. The current system will be detached and new higher wattage solar panels will be used with the original inverters. | David Davis | active | |
| 75 | roofing | 2026-07-29 | AUSTIN | 4000 AVENUE D | Storm Damage Repair - Service Rebuild | Jacob Rivera | finaled | |
| 75 | roofing | 2026-07-23 | AUSTIN | 3711 S MOPAC EXPY SVRD NB BLDG 2 | Replacement of exiting TPO roof for Building 1 & 2 Two Applications | Joseph Robertson | active | |
| 75 | roofing | 2026-07-23 | AUSTIN | 3711 S MOPAC EXPY SVRD NB BLDG 1 | Replacement of exiting TPO roof for Building 1 & 2 Two Applications | Joseph Robertson | active | |
| 75 | roofing | 2026-07-22 | AUSTIN | 301 W 29TH ST | 7 DAY - fire damage. Replace roof replace siding replace 2 balconies replace trusses drywall lights in corridor painting exterior. - OVA | Sarah Ewing | active | |
| 75 | roofing | 2026-07-17 | AUSTIN | 3300 NORTHEAST DR | Express: Re-roofing (located in WUI) - Replace hail-damaged composition roof with dimensional shingles and associated underlayment flashing drip edge pipe leads and like-kind vents. Work to comply with WUI requirements. No structural changes. | $1 | Douglas Redman | active |
| 75 | roofing | 2026-07-16 | AUSTIN | 3101 GOVALLE AVE | GAF TPO roof replacement system fully tapered insulation system. | Christopher Box | active | |
| 75 | roofing | 2026-07-16 | AUSTIN | 8000 RESEARCH BLVD SVRD SB | Replacement of (1) roof top unit - Like for like replacement | George Blaikie | active | |
| 75 | roofing | 2026-07-16 | AUSTIN | 1907 KENWOOD AVE UNIT B | Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit B: 3 bedroom 2 bath with rear covered patio. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT. | Cecilia Lopez | active | |
| 75 | roofing | 2026-07-09 | AUSTIN | 10625 W PARMER LN | RE ROOF - remove old tpo membrane and replace with new tpo roofing - OVA | active | ||
| 75 | roofing | 2026-07-08 | AUSTIN | 8001 S IH 35 SVRD NB BLDG 9 | Replacement of the Existing Roof on Building 9 of a Multi-Family Residential Complex | David Begala | active | |
| 75 | roofing | 2026-05-28 | AUSTIN | 2010 ALAMEDA DR | AISD Travis Heights Elementary School in Austin: project involves roof replacement at the Pre K classrooms cafeteria and gym electrical panel cover re | Rafael Thrash | active | |
| 75 | roofing | 2026-05-15 | AUSTIN | 1712 E 11TH ST | The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A 1B 1C 1D and 2A and ins | Michael Irwin | active | |
| 75 | roofing | 2026-05-04 | AUSTIN | 910 W 25TH ST | Fire Damage Remediation and Rebuild on 3 Floors Multiple units 210 505 506 605 606. Project will require Mechanical and Electrical Roof repaid with s | $4 | Jonathan Standley | active |
| 75 | roofing | 2026-05-04 | AUSTIN | 910 W 25TH ST | Fire Damage Remediation and Rebuild on 3 Floors Multiple units 210 505 506 605 606. Project will require Mechanical and Electrical Roof repaid with s | Raul Alonso | active | |
| 75 | roofing | 2026-03-23 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing a | $365,000 | Matthew Nelms | active |
| 75 | roofing | 2026-03-23 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing and mechanical. New windows | $365,000 | Urban Wolff | active |
| 75 | roofing | 2026-01-23 | AUSTIN | 7802 GINKGO CV | Express: Single roof replacement (located in WUI) | $41,923 | Chris Dammert | finaled |
| 75 | roofing | 2025-03-18 | AUSTIN | 6908 VILLITA AVENIDA | Express: siding replacement insulation window/door replacement (like for like) roof fascia drywall repair | $40,000 | Brenda Hernandez | finaled |
| 70 | roofing | 2026-07-20 | AUSTIN | 4205 RAMSEY AVE | Renovate existing 1-story ADU: Replace windows doors siding & roofing. Update MEP. Reconfigure floor plan/plumbing locations. Replace foundation in exact same footprint as existing. | Jose A. Martinez | active | |
| 70 | roofing | 2026-07-15 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | $1 | Tony Diaz | active |
| 70 | roofing | 2026-07-14 | AUSTIN | 4424 GAINES RANCH LOOP BLDG 18 | Shingle Replacement | Brad Davis | finaled | |
| 70 | roofing | 2026-07-13 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | Hung Pham | active | |
| 70 | roofing | 2026-07-13 | AUSTIN | 7603 RUSTLING CIR | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2.5bath] Work to include: First floor Interior remodel First Floor Addition new roof new beds new baths [5bed 3.5bath]. | Hung Pham | active | |
| 70 | roofing | 2026-06-04 | AUSTIN | 2507 WESTLAKE DR | Minor construction limited to maintenance/replacement of an existing shoreline access approx.240 sqft of ground-level boardwalks. There will be no increase in the existing footprint of the dock bulkhead or shoreline access. **Replacement of metal roof resurface 2nd floor deck and replace treads on existing stairs. The area of the roof and deck will remain unchanged. Some plywood decking will need replacement. No structural modifications. No expansion of footprint. No disturbing of shoreline or lakebed. Add replacement or repair of hydraulic lift. | $25,000 | Robert Depwe | active |
| 70 | roofing | 2026-05-21 | AUSTIN | 4205 RAMSEY AVE | Renovate existing 1-story ADU: Replace windows doors siding & roofing. Update MEP. Reconfigure floor plan/plumbing locations. Replace foundation in | $1 | Bijan Nayebi | active |
| 65 | roofing | 2026-08-03 | AUSTIN | 12809 N FM 620 RD NB | Simple Re-Roof. Existing retail. | David Bernal | active | |
| 65 | roofing | 2026-08-03 | AUSTIN | 6406 OLD BURLESON RD | Simple Re-Roof. Existing office. | Holly Zihlman | active | |
| 65 | roofing | 2026-08-03 | AUSTIN | 10416 WALPOLE LN | EXPRESS: Re roofing project. No major roof decking will be altered. Installing new roof asphalt shingles | $1 | Jay Martinez | active |
| 65 | roofing | 2026-07-30 | AUSTIN | 11424 VIRIDIAN WAY | Express- WUI Zone C reroofing with Class A fire roofing materials - Owens Corning Duration Shingles and OC underlayment. Mesh in ventilation. | $1 | Fareed Tulbah | active |
| 65 | roofing | 2026-07-30 | AUSTIN | 9508 CHINA ROSE DR | Express: Re roof | $1 | Fareed Tulbah | active |
| 65 | roofing | 2026-07-29 | AUSTIN | 2623 W 45TH ST | Reconfigure main bedroom suite. Main bathroom and laundry relocated. Interior walls to be removed and supporting beams installed to support joist and roof structure. New windows in areas remodeled and new front door and patio door in area remodeled. Not same for same. retroactively permit garage conversion | Richard Shields | active | |
| 65 | roofing | 2026-07-29 | AUSTIN | 3633 NORTH HILLS DR | RE-ROOF. TPO OVERLAY | Harold Peterson | active | |
| 65 | roofing | 2026-07-29 | AUSTIN | 2701 MOUNTAIN LAUREL LN | Rear covered patio addition with a galvanized steel roof (270 sqft) | $1 | Joshua Bucio | active |
| 65 | roofing | 2026-07-29 | AUSTIN | 601 RIO GRANDE ST UNIT 300 | ePlan: Commercial Expedited Review - Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) | Gary A Pritchard | active | |
| 65 | roofing | 2026-07-29 | AUSTIN | 1715 W CESAR CHAVEZ ST | ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Austin High School. Roof Recovering at Theater Building. (396761 SF). | Michael Bradby | active | |
| 65 | roofing | 2026-07-27 | AUSTIN | 13212 N LAMAR BLVD | Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym | Belinda Payne | active | |
| 65 | roofing | 2026-07-27 | AUSTIN | 5406 EVANS AVE | Express- replace existing metal roof with new standing seam metal roof. Decking will be replaced as a part of the project that necessitates permitting. | $1 | Ben Fuller | active |
| 65 | roofing | 2026-07-26 | AUSTIN | 1109 FIELDCREST DR | Relocate tub to where the toilet currently is and move toilet to where the tub was. Install shower valve. Run hot line from lavatory. Kill hot line to tub at manifold. Roll cold copper line into slab for commode. Run commode vent to another vent or through roof. | Cody Turner | active | |
| 65 | roofing | 2026-07-24 | AUSTIN | 3717 KANDY DR | Express: WUI zone C reroofing with class A fire roofing material- Owens Coming Duration shingles and OC Underlayment. | $1 | Fareed Tulbah | finaled |
| 65 | roofing | 2026-07-22 | AUSTIN | 9717 E US 290 HWY SVRD EB | Installing 101.75 kW Solar System with 185 ALEXUS ALEX-550-W-144-S Solar Panels and 2 SCA50KTL-DO/US-480 inverters on a commercial building roof. Disconnect/Reconnect + Upgrading main service* | Ortiz Moses | active | |
| 65 | roofing | 2026-07-22 | AUSTIN | 1509 WETHERSFIELD RD | Express: Fire damage repair 4/6/26 SM - REVISED**: Full interior remodel like for like. New roof New siding and sheathing New electrical plumbing and mechanical. | Christopher Woods | active | |
| 65 | roofing | 2026-07-16 | AUSTIN | 1025 BARTON SPRINGS RD | RE ROOF overlay existing modified with coating using new .6mil tpo. mechanically fastened at existing restaurant - OVA | Daniel McCoy | active | |
| 65 | roofing | 2026-07-16 | AUSTIN | 8204 BURNT CIR | Express: Re-roofing | $1 | Priyanka Bharath | active |
| 65 | roofing | 2026-07-15 | AUSTIN | 11108 BEXLEY LN | New 1-story detached stand-alone bathroom 8x10 single slope roof containing plumbing/electrical. | $0 | Joshua Bucio | active |
| 65 | roofing | 2026-07-14 | AUSTIN | 12113 METRIC BLVD BLDG 9 | Re-Roof for Building 9. | Russ Melbye | active | |
| 65 | roofing | 2026-07-14 | AUSTIN | 2412 LOYOLA LN | Express: Re-roofing (located in WUI) | $1 | Fareed Tulbah | active |
| 65 | roofing | 2026-07-10 | AUSTIN | 1034 LIBERTY PARK DR | re-roof at existing senior living facility main building | JRC INC | active | |
| 65 | roofing | 2026-07-09 | AUSTIN | 5609 PORSCHE LN | Demolish existing detached metal carport and construct new attached 2 car garage conditioned hallway and connection and covered entry with new slab/foundation framing roofing exterior finishes electrical | $1 | Mohammad Zarbaf | active |
| 65 | roofing | 2026-07-08 | AUSTIN | 2101 E ST ELMO RD BLDG 1 UNIT 150 | Addition of exterior concrete enclosure with roof to store flammable gases in the truck court. | JJ Gomez | finaled | |
| 65 | roofing | 2026-07-06 | AUSTIN | 10109 BRODIE LN | Express: Re-roofing repair bad decking and fascia where necessary. Replace drip edge | $1 | Michael Guiney | active |
| 65 | roofing | 2026-07-01 | AUSTIN | 512 SABINE ST | ePlan: Commercial Expedited Review - [AE GREEN BUILDING] New Construction of Amenity Space (Roof Deck) Phase III 6thFloor. | $79,500,000 | Kristin Thompson | active |
| 65 | roofing | 2026-06-19 | AUSTIN | 8502 WALHILL CV | Express: Re-roof - material change (tile to metal) (Located in WUI) | $1 | Stacie Feller | active |
| 65 | roofing | 2026-06-10 | AUSTIN | 2512 E 2ND ST | Express: Re-roof | $26,611 | Hanna Hernandez | finaled |
| 65 | roofing | 2026-05-28 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window | Darrin Petru | active | |
| 65 | roofing | 2026-05-26 | AUSTIN | 3201 WEST AVE | Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window | $1 | Jamie Borkowski | active |
| 65 | roofing | 2026-05-20 | AUSTIN | 1905 KERR ST | Partial Demolition1-story addition/interior remodel to existing residence. New covered porch new roof new flat work driveway (within property lines) r | Matthew Archer | active | |
| 65 | roofing | 2026-05-18 | AUSTIN | 2901 S CAPITAL OF TEXAS HWY NB | Roof recover. No structural changes. Remove existing roof membrane. Install a Carlisle 135-Mil white TPO Fleeceback membrane over the existing insulat | Jarrell Perrin | active | |
| 65 | roofing | 2026-05-15 | AUSTIN | 4504 JINX AVE | Express- remove existing roof and replace with new modified roof that allows a 7 foot max gable height to accommodate new AC unit. This work does not | $1 | Trinidad Aleman | active |
| 65 | roofing | 2026-05-13 | AUSTIN | 1712 E 11TH ST | The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A 1B 1C 1D and 2A and ins | Ian Rolls | active | |
| 65 | roofing | 2026-05-13 | AUSTIN | 1712 E 11TH ST | The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A 1B 1C 1D and 2A and ins | John Robinson | active | |
| 65 | roofing | 2026-05-06 | AUSTIN | 7206 EASTCREST DR | Sewer line replacement of 50 feet We will need to conduct a camera inspection of the line. This will involve accessing the vent stack on the roof to identify the points where both sewer lines exit the building. Once located we will proceed with excavation to reroute both lines that emerge from the house subsequently connecting them and extending to the city tap. | Allen Redmon | active | |
| 65 | roofing | 2026-05-04 | AUSTIN | 2915 E CESAR CHAVEZ ST | ePlan: Commercial Expedited Review - Phase 3B New Construction of Multi Family Res with Res Units Fitness Room Weights Room Sky Lounge Roof Lounge an | Samuel Piedra | active | |
| 65 | roofing | 2026-03-25 | AUSTIN | 6809 WILLAMETTE DR | Interior Remodel New electrical system mechanical system paint flooring interior doors plumbing fixtures & cabinets. New exterior paint and asphalt shingle roof. | $90,000 | David Isaac | active |
| 65 | roofing | 2026-03-07 | AUSTIN | 3817 WESTLAKE DR | Includes replacing cabinetry in the existing boat dock replacing the dock roof and replacing the dock enclosure with no structural modifications. Incl | $90,000 | Jeff Turner | active |
| 65 | roofing | 2026-03-07 | AUSTIN | 3817 WESTLAKE DR | Includes replacing cabinetry in the existing boat dock replacing the dock roof and replacing the dock enclosure with no structural modifications. Include Electrical. | $90,000 | Jeff Turner | active |
| 65 | roofing | 2026-02-26 | AUSTIN | 8600 BELL MOUNTAIN DR | Interior remodel and partial garage and porch enclosures to an existing single-family residence. Scope of work includes a full interior remodel of all rooms including reconfiguration of interior spaces as shown on plans. The project includes enclosing a portion of the existing garage to create a conditioned entry mudroom and laundry room and enclosing a portion of the existing porch adjacent to the primary bedroom to expand the primary suite. Exterior work associated with this project includes replacement of damaged exterior wall sheathing full roof replacement and replacement of all existing windows and exterior doors. | Russell Neal | active | |
| 65 | roofing | 2026-02-23 | AUSTIN | 6605 WEST COURTYARD DR | Interior remodel of existing single-family residence. Scope includes selective removal and reconfiguration of an interior load-bearing wall with engineered beam replacement and construction of a single code-compliant interior step due to existing floor elevation change with minor electrical modifications. No change to building footprint exterior walls roof use or unit count. | James Reese | finaled | |
| 65 | roofing | 2026-02-23 | AUSTIN | 8600 BELL MOUNTAIN DR | Interior remodel and partial garage and porch enclosures to an existing single-family residence. Scope of work includes a full interior remodel of all rooms including reconfiguration of interior spaces as shown on plans. The project includes enclosing a portion of the existing garage to create a conditioned entry mudroom and laundry room and enclosing a portion of the existing porch adjacent to the primary bedroom to expand the primary suite. Exterior work associated with this project includes replacement of damaged exterior wall sheathing full roof replacement and replacement of all existing windows and exterior doors. | Frank Flores | active | |
| 65 | roofing | 2026-02-20 | AUSTIN | 8600 BELL MOUNTAIN DR | Interior remodel and partial garage and porch enclosures to an existing single-family residence. Scope of work includes a full interior remodel of all rooms including reconfiguration of interior spaces as shown on plans. The project includes enclosing a portion of the existing garage to create a conditioned entry mudroom and laundry room and enclosing a portion of the existing porch adjacent to the primary bedroom to expand the primary suite. Exterior work associated with this project includes replacement of damaged exterior wall sheathing full roof replacement and replacement of all existing windows and exterior doors. | $1 | Rusty Stout | active |
| 65 | roofing | 2026-02-18 | AUSTIN | 6801 JESTER BLVD | Replacement of existing deck siding and roof. Partial raising of interior floor. Remodel of deck to match height of interior/avoid entry steps. Slight increase in sqft to accommodate new floor height and deck interface. 2 new 1st floor storage room additions (enclosing courtyard between house and garage | $1 | Nick Chappell | active |
| 65 | roofing | 2026-02-17 | AUSTIN | 6605 WEST COURTYARD DR | Interior remodel of existing single-family residence. Scope includes selective removal and reconfiguration of an interior load-bearing wall with engineered beam replacement and construction of a single code-compliant interior step due to existing floor elevation change with minor electrical modifications. No change to building footprint exterior walls roof use or unit count. | $1 | Thomas Kocis | finaled |
| 65 | roofing | 2026-02-17 | AUSTIN | 1407 W 9TH ST | OPTED INTO HOME - 2ND DWELLING - Existing 2-story structure to remain unless noted otherwise. Full interior renovation Demo of attached carport Renovation of existing balcony Single-story addition @ east side Demo and replacement of existing exterior stair Partial demo + reshaping (net loss of square footage) of existing west faade New roofing | Mark Scarborough | active | |
| 65 | roofing | 2026-01-13 | AUSTIN | 10000 RESEARCH BLVD SVRD SB UNIT 115 | Remodel of existing retail space. Demo front entry and extend it under existing roof on existing foundation to capture 73 additional Sq.Ft. MEP scope. | $78,680 | Holly Platt | finaled |
| 65 | roofing | 2026-01-13 | AUSTIN | 10000 RESEARCH BLVD SVRD SB UNIT 115 | Remodel of existing retail space. Demo front entry and extend it under existing roof on existing foundation to capture 73 additional Sq.Ft. MEP scope. No access control. Awning by separate permit not in scope. Concurrent Review requested | $78,680 | Holly Platt | finaled |
| 65 | roofing | 2026-01-09 | AUSTIN | 1405 S 6TH ST UNIT B | *Partial demo* Interior remodel: full interior remodel of both units; Addition to join existing non-complying duplexes. Common wall to be added. Exterior stairs to become interior/ will be reconfigured. New square footage comes from adjoining both duplexes. New roof too deck/garden. | $150,000 | Garrett Jacobs | active |
| 65 | roofing | 2026-01-09 | AUSTIN | 1405 S 6TH ST UNIT A | *Partial demo* Interior remodel: full interior remodel of both units; Addition to join existing non-complying duplexes. Common wall to be added. Exterior stairs to become interior/ will be reconfigured. New square footage comes from adjoining both duplexes. New roof too deck/garden. | $150,000 | Garrett Jacobs | active |
| 65 | roofing | 2025-11-05 | AUSTIN | 2900 WATER BANK CV | Addn To Exist Sf Residence To Expand Roof And Add Porch Relocate Exist Electrical Fixtures. Amnesty CO. | $46,000 | Gary L. Beam | finaled |
| 65 | roofing | 2025-10-23 | AUSTIN | 2903 OAKHURST AVE | Add New roof dormer interior remodel | $50,000 | CHRISTOPHER LAMBERT | finaled |
| 65 | roofing | 2025-10-15 | AUSTIN | 2611 ADDISON AVE | Express- Reroof; existing decking breaking underfoot; full sheathing (decking) needed replacement | $1 | finaled | |
| 65 | roofing | 2025-10-13 | AUSTIN | 2202 TRAILSIDE DR BLDG B | *Partial demo* Interior remodel converting existing basement to office and converting carport to garage. Adding roof top deck. Changing few windows a | $30,000 | Peter Abendschein | active |
| 65 | roofing | 2025-10-09 | AUSTIN | 2915 E CESAR CHAVEZ ST | ePlan: Commercial Expedited Review - Phase 3B New Construction of Multi Family Res with Res Units Sky Lounge Roof Lounge and Restrooms. ***Phasing - | $100,000,000 | Chris Rembowski | active |
| 65 | roofing | 2025-09-30 | AUSTIN | 5914 LOST HORIZON DR | ePlan: Commercial Expedited Review - Interior Remodel and Addition to Existing Club House. Work to include Expansion of Outdoor Patio with Roof Coveri | $330,000 | Drew Hanish | active |
| 65 | roofing | 2025-07-28 | AUSTIN | 3007 ROGGE LN | express - roof removal sheathing removal and replacement and removal and replacement of all roofing facets | $20,000 | Bryan Swimm | finaled |
100 rows shown